Government Contract | Oregon
PUMP STATION #1 PUMP REPLACEMENTS DESIGN & CONSTRUCTION SUPPORT

Bid Information


Bid Alert No: 00001076755

Bid Title: PUMP STATION #1 PUMP REPLACEMENTS DESIGN & CONSTRUCTION SUPPORT

Agency Bid No. Title: C26014-1018-17

Received Date: 08/31/2017

Close Date: 10/02/2017

Purchase Type: Not Stated

Delivery Point: Multnomah County, Oregon

Delivery Date: Not Stated

Special Notices: Pre-Bid Conference Mandatory 09/07/2017 10:00 AM, Questions Due By Optional 09/12/2017 04:00 PM

Specifications

Specifications include, but are not limited to:his project is set to address the following issues: Replacing pumps 1 and 5, due to the condition and age Replacing a portion of discharge pipes for pumps 1 and 5 that are located inside the PS 1building Improving the energy use1. Pre-design: The predesign phase of the project, at minimum will include: Collection of available data and information pertinent to the project, and data collectioncoordination with MCDD staff Define design objectives and criteria Identification of deficiencies in the pump stations with a focus on pumps of interest New pump designs for Pumps 1 and 5 Replace parts of discharge pipes for Pumps 1 and 5 Review of mechanical, electrical, civil and structural components of the pumps and pumpstations Track pump energy use and motor data Evaluate soft starting options for the pumps Evaluate generator and power back up options Evaluate the size of the pumps Evaluate potential electrical code change requirementsWork with Energy Trust to assess potential energy and cost savings Include any potential permit requirements Evaluate site for construction access Alternatives design development Conduct a workshop with MCDD staff and District Stakeholders to review and discuss thealternatives and select a preferred alternative Prepare plan and profile design for 30% design completion Prepare a preliminary construction cost estimate Prepare a predesign report Conduct a workshop with MCDD staff and District Stakeholders to review and discuss the30% design, predesign report and construction cost Finalize predesign report2. Design: The design phase of the project will, at a minimum, include: Assist MCDD with preparation of any required permit applications Prepare required applications for MCDD to apply for energy efficiency incentives availablethrough the Energy Trust of Oregon, State of Oregon Business Energy Tax Credit program,and others as applicable Develop and submit 60%, 90%, and 100% design packages for MCDD review and commentincluding drawings, specifications in 6-digit CSI format, cost estimates for construction and aprojected construction schedule Prepare a bid items list Conduct meetings with MCDD staff to review and discuss the 60% and 90% design,specifications, construction cost estimate and schedules and bid items Provide permitting support related to pertinent exhibits and technical information as needed;MCDD staff will assemble documents and submit permit applications. Develop and submit signed 100% plans and specifications, an engineers estimate onconstruction cost, a detailed construction schedule and final bid items Develop structural design calculations for MCDD review Prepare a final design report Complete additional bid documents to support MCDD Construction Bid Book

Product Codes: 95826, 92518

Agency Information


Issuing Agency: Multnomah County Drainage District

State: Oregon

Agency Type: State and Local

Contact: Brian Eberhardt 1880 NE Elrod Drive, Portland, Oregon, 97211

Phone: 503-281-5675

Email: beberhardt@mcdd.org

< PREVIOUS PAGE

GET A FREE
MARKET
ANALYSIS

FREE Market Analysis


Get a FREE 90-Day Market Analysis and see the bids you’ve been missing

GET BIDS NOW