Government Contract | Texas
Wastewater Improvement for nine (9) Alleys

Find Open Contracts in the Architecture and Engineering Industry

Find Contracts Now

Bid Information


Bid Alert No: 00002756725

Bid Title: Wastewater Improvement for nine (9) Alleys

Agency Bid No. Title: 1143-21

Received Date: 09/21/2021

Close Date: 10/14/2021

Purchase Type: Not Stated

Delivery Point: Garland, Texas

Delivery Date: Not Stated

Special Notices: Questions Due By 10/08/2021 12:00 PM, Pre-Bid Conference Optional 09/28/2021 10:00 AM, Bidder Preregistration, Bid Bond Required: 5%

Specifications

Specifications include, but are not limited to: 1.2 QUALITY ASSURANCEProvide at least one person who shall be present at all times during execution of this portion of thework, who shall be thoroughly familiar with the type of equipment being installed and the propermaterials and methods for their installation, and who shall direct all work performed under this section.Landscape materials shall comply with government regulations prevailing at the supply source and jobsite. All materials shall be of the type and quality as specified herein.1.3 GUARANTYGuaranty all sodded lawns for a period of 30 days from the date of completion to be at least the qualityand condition as at final acceptance. Promptly resod unacceptable areas during the guaranty periodas directed by the Landscape Architect.1.4 SUBMITTALSWithin thirty (30) days of the award of the contract, submit a complete list of all materials proposed tobe furnished and installed under this section. Submit the name and address of grower of the sod.Supply the sod growers Certificate verifying the turf variety to the Owner.1.5 FINAL ACCEPTANCEThere will be one date of acceptance for the entire project. Acceptance will be based upon asatisfactory stand of turf as specified under Establishment.2.1 SODProvide Common Bermuda grass (Cynodon dactylon) grown in a sod nursery on topsoil, one year oldwith a heavy top, and a strong, well-knit root system. Sod shall be free of noxious weeds and disease.2.2 SOIL AMENDMENTSPrior to sod installation, the contractor will apply a complete fertilizer with a dry weight percentage of27-9-18 (N-P-K) containing zinc and iron. Application will be at the rate of 325 pounds per acre.Apply a second application of fertilizer, dry weight percentage 27-9-18 (N-P-K), four weeks after theplanting date. Application will be at the rate of 325 pounds per acre.

Product Code: 91345

Agency Information


Issuing Agency: City of Garland

State: Texas

Agency Type: State and Local

Contact: 200 N. 5th Street, 2nd Floor, Garland, Texas, 75040

< PREVIOUS PAGE

GET A FREE
MARKET
ANALYSIS

FREE Market Analysis


Get a FREE 90-Day Market Analysis and see the bids you’ve been missing

GET BIDS NOW