Government Contract | Minnesota
Snow Removal and Parking Lot Sweeping

Find Open Contracts in the Architecture and Engineering Industry

Find Contracts Now

Bid Information


Bid Alert No: 00002208085

Bid Title: Snow Removal and Parking Lot Sweeping

Agency Bid No. Title: Not Stated

Received Date: 06/11/2020

Close Date: 06/22/2020

Purchase Type: Term:

Delivery Point: Anoka Ramsey Community College, Coon Rapids, Minnesota

Delivery Date: Not Stated

Specifications

Specifications include, but are not limited to: The Contractor will be responsible for removing snow fall of one (1) inch or more. For each snow fall event, the Contractor shall apply salt as needed to prevent icy conditions from occurring in the lots. The Contractor may propose pre-treatment of the lots and roadways as an alternate. Primary snow removal hours will be between the hours of 10:30 pm and 6:30 am the following day. However, the Contractor may be called in during the day if needed to respond to a heavy snow fall event. In the event of a daytime call out, same day service is required.The College may direct the contractor to apply salt at times other than snow events if icy lot conditions occur.Snow fall shall be removed from the parking lots, College roads and entrances in the order designated by the Colleges Director of Facilities or designated representative. Contractor will be responsible for communicating this order to Contractors response team. The general priority will be:1.Roadways and entrances of the main campus and employee parking. 2.Parking lots 1, 2 and 3, including all handicap parking areas. 3.Salt all lots after a snow event.The Contractor may not store equipment, salt/sand, or fuel on site.Snow pile locations will be agreed upon between the College Director of Facilities and the Contractor prior to the start of each snow removal season. If it becomes necessary to remove snow from the Campus or push back snow piles, the College must be notified and must approve the work in writing (email is adequate) prior to Contractor commencing work. The Contractor will mark all roadways, parking lot islands and corners. The College staff will mark irrigation valve boxes. No part of the snow removal contract may be sub-contracted without owner approval.

Bid Related Documents

Download Document

Product Codes: 96872, 96874

Agency Information


Issuing Agency: Anoka-Ramsey Community College

State: Minnesota

Agency Type: State and Local

Contact: Angela Shevchuk 1355 W Highway 10, Anoka, Minnesota, 55303

Phone: 763-576-4157

Email: ashevchuk@anokatech.edu

< PREVIOUS PAGE

GET A FREE
MARKET
ANALYSIS

FREE Market Analysis


Get a FREE 90-Day Market Analysis and see the bids you’ve been missing

GET BIDS NOW