Government Contract | New York
RFP 7580 University at Buffalo Ellicott Welcome Center CM Build

Bid Information


Bid Alert No: 00002889384

Bid Title: RFP 7580 University at Buffalo Ellicott Welcome Center CM Build

Agency Bid No. Title: 7580

Received Date: 01/24/2022

Close Date: 02/18/2022

Purchase Type: Not Stated

Delivery Point: Not Stated, New York

Delivery Date: Not Stated

Special Notices: Pre-Bid Conference 01/25/2022 01:00 PM, Questions Due By 02/01/2022 05:00 PM

Specifications

Specifications include, but are not limited to: DASNY seeks proposals from Construction Managers to provide, professional construction managementservices during the design and construction of the University at Buffalo Ellicott Welcome Center projectusing a Construction Manager-Build (CM-Build) project delivery method.The project includes the renovation of approximately 24,000 sf of existing interior space and exterior plazaspace at the Ellicott Complex with an estimated construction value of $12,000,000. The renovation willenhance the faade, exterior space, and interior wayfinding experience at the South side of the Fargo Quadto create a proper gateway from the academic spine into the residential Ellicott Complex. On the exterior,the project will consist of construction of a new canopy, exterior stairs to the plaza level, and enclosing aportion of the plaza level for circulation and gathering spaces. On the interior, the project will add a definedcirculation path through the first level, onto the plaza level and will feature new Campus Living officespace, various lounge areas, and a small marketplace.The project is to be carried out in phases and within a year -round, 24/7 occupied facility. Delivery is toinclude temporary access/exit from the complex during various phases so as to not impede pedestrian and/orvehicular traffic.A CM-Build project delivery method is similar to a Construction Manager-at-Risk project delivery method,in that the Construction Manager is involved during the design phase of the project, procures theconstruction phase trade contracts, and manages the construction phase of the project. However, in a CM-Build delivery method, a Guaranteed Maximum Price is not provided prior to bidding the trade packages, rather a Maximum Contract Price (MCP)1 is established after the Construction Manager receives thetrade bid packages. The CM-Build Contractor (hereinafter referred to as the Construction Manager orCM) is a Construction Manager who will contract with DASNY to submit an MCP.Services will be performed and executed in two separate contracts : Pre-Construction Contract andConstruction Contract (Attachments a. and b.). Costs associated with General Conditions Work Items willbe included as part of the Construction Contract and will include but are not limited to the items listed inAppendix B of the attached sample Construction Contract . DASNYs standard General Conditions forConstruction will apply to all Construction Work.

Product Code: 95826

Agency Information


Issuing Agency: Dormitory Authority of the State of New York (DASNY)

State: New York

Agency Type: State and Local

Contact: Kelly Whitbeck

Email: rfpcoordinator@dasny.org