Government Contract | Arizona
Request for Qualifications - City of Chandler Professional Services - Alma School Road Improvements (Pecos to Germann) and Gilbert Road Improvements (Ocotillo to Chandler Heights) ; ST2004.451

Bid Information


Bid Alert No: 00002074110

Bid Title: Request for Qualifications - City of Chandler Professional Services - Alma School Road Improvements (Pecos to Germann) and Gilbert Road Improvements (Ocotillo to Chandler Heights) ; ST2004.451

Agency Bid No. Title: BPM002353

Received Date: 02/28/2020

Close Date: 03/31/2020

Purchase Type: Not Stated

Delivery Point: Chandler, Arizona

Delivery Date: Not Stated

Special Notices: Pre-Bid Conference 03/09/2020 10:00 AM, Questions Due By 03/19/2020 05:00 PM

Specifications

Specifications include, but are not limited to: The Alma School Road Improvements, located on Alma School Road, from north of Pecos Road to south of Germann Road. This project will widen Alma School Road to three through lanes in each direction from Maplewood Street through the Germann Road intersection, with the road width tapering back to match the existing at Kingbird Drive. The project may also be extended to encompass the northeast corner of the intersection at Pecos and Alma School Road with northbound Alma School Road being widened to three lanes and tapered down to two lanes north of the intersection. Alma School Road from Pecos to Loop 202 will be improved by private developers. The improvements consist generally of the widening to the inside for additional lanes, raised landscaped median, curb, gutter, sidewalk, Americans with Disabilities Act upgrades, traffic signal upgrades, streetlights, traffic signal interconnect, storm drainage, irrigation, and wet/dry utility improvements. The improvements may require the purchase of utility easements and/or temporary construction easements.The Gilbert Road Improvements (Ocotillo Road to Chandler Heights Road) will add a third southbound lane on Gilbert Road between Ocotillo Road and Powell Place, and a new Traffic signal just south of Ocotillo Road to serve the Frys and Sprouts shopping centers. The project may also include road widening along the east side of Gilbert Road from Ocotillo Road to Chandler Heights Road for a third northbound through lane and associated improvements, including a new traffic signal at Brooks Farm Road, and also a new traffic signal north of Brooks Farm Road. The project may also include a fourth new traffic signal, stormwater retention basin, and associated improvements at the intersection on Chandler Heights Road at Mustang Drive/Desert Jewel Boulevard. The improvements consist generally of additional lanes, raised landscaped median, curb, gutter, sidewalk, Americans with Disabilities Act upgrades, traffic signal upgrades, streetlights, traffic signal interconnect, storm drainage, irrigation, traffic signals, and wet/dry utility improvements. The improvements may require the purchase of utility easements and/or temporary construction easements.

Bid Related Documents

Download Document

Amendments

Download Amendment

Product Codes: 91275, 92532, 95826, 96847

Agency Information


Issuing Agency: City of Chandler

State: Arizona

Agency Type: State and Local

Contact: Paula Brown, Purchasing Office

Phone: 480-782-3308

Fax: 480-782-2410

Email: paula.brown@chandleraz.gov

< PREVIOUS PAGE

GET A FREE
MARKET
ANALYSIS

FREE Market Analysis


Get a FREE 90-Day Market Analysis and see the bids you’ve been missing

GET BIDS NOW