Government Contract | Connecticut
Preliminary Design Concept- E. H. High School Replacement of Existing Tri-Gen Plant and Absorber

Bid Information


Bid Alert No: 00002200973

Bid Title: Preliminary Design Concept- E. H. High School Replacement of Existing Tri-Gen Plant and Absorber

Agency Bid No. Title: 1770-20R

Received Date: 06/08/2020

Close Date: 06/30/2020

Purchase Type: Not Stated

Delivery Point: East Hartford Middle School, East Hartford, Connecticut

Delivery Date: Not Stated

Special Notices: Pre-Bid Conference Mandatory 06/12/2020 09:00 AM, Bidder Preregistration

Specifications

Specifications include, but are not limited to: All phases of commercial mechanical engineering, design and consultation. Evaluation of a Tri-Gen (CHPS) System operation in relation to its original design capabilities. Providing multiple conceptual design options for new central plant equipment to replace theexisting system. Delivering budget cost estimates for proposed replacement options supported by data from pastprojects, equipment manufacturer cost, mechanical contractor cost, engineering cost, etc. Performing detailed analysis and presentation of: project costs (hard and soft costs), paybackanalysis, utility cost, life-cycle cost, utility incentives and electricity purchase avoidance (savings)when proposing preliminary design concepts for replacement.

Bid Related Documents

Download Document

Product Code: 92516

Agency Information


Issuing Agency: East Hartford Public Schools

State: Connecticut

Agency Type: State and Local

Contact: David J. Bell 734 Tolland Street, East Hartford, Connecticut, 06108

Email: bell.dj@easthartford.org

< PREVIOUS PAGE

GET A FREE
MARKET
ANALYSIS

FREE Market Analysis


Get a FREE 90-Day Market Analysis and see the bids you’ve been missing

GET BIDS NOW