Government Contract | Michigan
Main Campus Library and Technology Center (LIT) Chiller Replacement

Find Open Contracts in the Architecture and Engineering Industry

Find Contracts Now

Bid Information


Bid Alert No: 00002348723

Bid Title: Main Campus Library and Technology Center (LIT) Chiller Replacement

Agency Bid No. Title: Not Stated

Received Date: 09/24/2020

Close Date: 10/12/2020

Purchase Type: Not Stated

Delivery Point: Muskegon Community College, Muskegon, Michigan

Delivery Date: Not Stated

Special Notices: Pre-Bid Conference Mandatory 09/28/2020 10:00 AM, Bidder Preregistration

Specifications

Specifications include, but are not limited to: Assembly, delivery and installation shall be performed by the contracted party. This project is not subject to Michigan prevailing wage requirements. To ensure there is no conflict with the delivery of items the contractor shall coordinatethe delivery date, delivery location, and installation schedule of items with the collegescontract administrator prior to first delivery date. All transportation, delivery, installation, and disposal arrangements shall be theresponsibility of the contractor. Items shall be delivered directly to the installation site. Delivery shall be made from the loading dock intersection to the main campus boilerhouse. The contractor shall have complete responsibility for supplies, items and equipment untilthey are unpacked, assembled and installed in the main campus boiler house.

Bid Related Documents

Download Document

Bid Related Attachments

Download Attachment

Product Codes: 94125, 91450

Agency Information


Issuing Agency: Muskegon Community College

State: Michigan

Agency Type: State and Local

Contact: Mike Council 221 S. Quarterline Road, Room # 1044C, Muskegon, Michigan, 49442

Phone: 231-777-0669

Email: mike.council@muskegoncc.edu

< PREVIOUS PAGE

GET A FREE
MARKET
ANALYSIS

FREE Market Analysis


Get a FREE 90-Day Market Analysis and see the bids you’ve been missing

GET BIDS NOW