Bid Information
Bid Alert No: 00002890762
Bid Title: High Performance Compute Cluster
Agency Bid No. Title: AK1-SMU-HPC2022
Received Date: 01/25/2022
Close Date: 02/18/2022
Purchase Type: Not Stated
Delivery Point: Southern Methodist University, Dallas, Texas
Delivery Date: Not Stated
Special Notices: Questions Due By 01/28/2022, Bidder Preregistration
Specifications
Specifications include, but are not limited to: 2.3 SMU Next Generation HPC Cluster Design Targets2.1.1 At least 11,000 cores compute capacity.2.1.2 8 high memory compute nodes (>= 2 TB each).2.1.3 170 standard compute nodes (>=256 GB memory)2.1.4 InfiniBand interconnects to support all compute nodes, storage devices and servicenodes with a capacity to grow up to 360 ports. Spine switches are excluded from thismaximum. [Other high-speed interconnect solutions will be considered if it matches thecapabilities of InfiniBand.]2.1.5 Additional consideration for storage cabinet InfiniBand switches: Implement sufficient redundancy to overcome single point of failurewith regards to storage-nodes/storage-appliances connecting toTOR switches or spine switches.2.1.6 Additional consideration for service node cabinet switches Distribute service nodes between two cabinets for serviceredundancy, and each cabinet having its own TOR switches.2.1.7 At least 10Gb Ethernet connection to all nodes for NFS storage and in-bandnodemanagement.2.1.8 1Gb Ethernet connection to all nodes and devices for out-of-band node management.2.1.9 Competing configurations with AMD and Intel processors are requested eachwith at least 32 cores per processor.2.1.10 All configurations need to support PCIe Gen. 4.2.1.11 RFP asks each Company for base proposal configured with industry standard 1uand 2u servers and InfiniBand HDR interconnects. A second (optional) proposalmay be submitted with any innovative options the Company chooses to offer aslong as it meets software compatibility and performance of base configuration.2.1.12 Start-up services to be included to shorten deployment time after hardware arrival.2.1.13 Cluster Management Software included to enable rapiddeployment/provisioning/monitoring of new systems and software to all nodes.Cluster management software must facilitate configuration management ofcustom OS images.2.1.14 System Management Software included to facilitate firmware management andhardware configuration (e.g., BIOS) management.
Bid Related Documents
Download DocumentProduct Codes: 20400, 20491, 20453
Agency Information
Issuing Agency: Southern Methodist University (SMU)
State: Texas
Agency Type: State and Local
Contact: Abby Kinney
Email: akinney@smu.edu