Government Contract | Georgia
Comprehensive Master Plan

Bid Information


Bid Alert No: 00002166007

Bid Title: Comprehensive Master Plan

Agency Bid No. Title: 21-526

Received Date: 05/11/2020

Close Date: 06/16/2020

Purchase Type: Not Stated

Delivery Point: DeKalb County School District, Georgia

Delivery Date: Not Stated

Special Notices: Questions Due By 06/01/2020 12:00 PM, Pre-Bid Conference 05/21/2020 01:00 PM

Specifications

Specifications include, but are not limited to: 1. Complete a visual, non-destructive inspection of the specified facilities noted under Attachment D. The inspection, combined with a review of base building data and maintenance history, shall be completed by a qualified professional architectural and engineering firm and used to produce an accurate quantitative and qualitative assessment of building condition that identifies deficient components and elements (including building and life/safety code compliance deficiencies) of the buildings, site utilities and infrastructure. Building elements for inspection shall match Uniformat level 2, at a minimum, and include the condition of education specific site elements such as playgrounds, play fields, athletic fields, paved surfaces, etc. Building inspectors will be accompanied by DCSD staff and building inspections may be attended by community members. 2. Provide an assessment of the percentage used of the service lifespan of building components for renewal forecasting. The inspection team shall provide baseline standards for reference to support the service life for each element. Building components beyond service life shall be assessed to determine relative condition and priority of system replacement. Site elements such as paving shall be divided into sections as necessary to appropriately assess the relative condition of each section. 3. Provide an assessment using quantitative repair vs replacement costs of: a. ADA-related deficiencies b. Building code related deficiencies c. Life/safety code compliance deficiencies d. Existing deferred maintenance deficiencies4. For every deficiency identified in the assessment, develop one or more means of mitigation (a required action). Each required action shall entail a description of the methods and materials necessary to conduct the work. Each requirement should include a preliminary budget and schedule for the work. The cost models shall include a defined escalation rate. 5. Provide a Facility Assessment Report for every facility in electronic form. Facilities with multiple buildings will be included in a single report, with each building being separately identified in the report.

Product Codes: 92516, 92532, 91892, 91838, 94655

Agency Information


Issuing Agency: DeKalb County School District (DCSD)

State: Georgia

Agency Type: State and Local

Contact: Purchasing Department, 1701 Mountain Industrial Boulevard, Stone Mountain, Georgia, 30083

< PREVIOUS PAGE

GET A FREE
MARKET
ANALYSIS

FREE Market Analysis


Get a FREE 90-Day Market Analysis and see the bids you’ve been missing

GET BIDS NOW