Government Contract | North Carolina
Charlotte-Mecklenburg Government Center (CMGC) Generators Replacement

Bid Information


Bid Alert No: 00002356463

Bid Title: Charlotte-Mecklenburg Government Center (CMGC) Generators Replacement

Agency Bid No. Title: PMFM 201619

Received Date: 10/01/2020

Close Date: 11/05/2020

Purchase Type: Not Stated

Delivery Point: 600 East Fourth Street, Charlotte, North Carolina, 28202

Delivery Date: Not Stated

Special Notices: Pre-Bid Conference Optional 10/15/2020 01:00 PM, Site-Walk Optional 10/16/2020 09:00 AM, Bidder Preregistration, MWDB: MBE 5%, SBE 11%, Bid Bond Required: 5%

Specifications

Specifications include, but are not limited to: The project consists of replacing two (2) 475 kVA emergency paralleled generators in the sub-plaza levelof the Government Center. The existing generators along with the existing paralleling gear, exhaust, fuel,cooling, and branch circuit systems shall be demolished and replaced. In detail these include, but are notlimited to: two (2) existing radiators in the pit adjacent to the generator room, the existing parallelinggear, the exhaust piping stack up to the roof level, all existing cooling and fuel piping, the existing fuelpumps, and all electrical branch circuit for ancillary generator loads. The existing generators shall beremoved in such a manner as to ensure they can be resold by the general contractor for a credit back tothe City. Two (2) new CAT emergency-rated 500 kVA generators (purchased directly by the City) shall beinstalled along with a new 2000 amp, 480/277V switchboard (also purchased directly by the City), whichshall replace the existing paralleling switchboard. The new generators shall be equipped with onboardparalleling technology. New control wiring shall be provided and installed to two (2) new annunciatorsand the existing building management system at the security desk adjacent to the elevator lobby on thesub-plaza level of the facility. A 1MW temporary generator shall be provided and installed by the electricalcontractor adjacent to the street and exterior wall of the generator room to provide temporary backuppower coverage while the existing gear systems are demolished and replaced. The general contractor isrequired to provide a construction schedule and participate in necessary pre-construction andconstruction progress meetings during the duration of the project. The City shall provide a commissioningagent to develop all commissioning scripts and testing procedures at the conclusion of constructionactivities. The General Contractor shall be responsible for all necessary materials and labor necessary forthe performance of the scripted commissioning activities

Product Codes: 28539, 91438

Agency Information


Issuing Agency: City of Charlotte

State: North Carolina

Agency Type: State and Local

Contact: Courtney Farmer Engineering & Property Management, 531 Spratt Street, Charlotte, North Carolina, 28206

Phone: 704-336-3651

Fax: 704-336-2291

Email: courtney.farmer@charlottenc.gov

< PREVIOUS PAGE

GET A FREE
MARKET
ANALYSIS

FREE Market Analysis


Get a FREE 90-Day Market Analysis and see the bids you’ve been missing

GET BIDS NOW