Government Contract | California
10.0 MG RESERVOIR 4605-2 CONSTRUCTION (SKY MOUNTAIN PRESSURE ZONE)

Bid Information


Bid Alert No: 00002354347

Bid Title: 10.0 MG RESERVOIR 4605-2 CONSTRUCTION (SKY MOUNTAIN PRESSURE ZONE)

Agency Bid No. Title: 2020-6

Received Date: 09/29/2020

Close Date: 10/21/2020

Purchase Type: 540 calendar days

Delivery Point: Coachella Valley Water District, Coachella, California

Delivery Date: Not Stated

Special Notices: Questions Due By 10/13/2020 05:00 PM, Bidder Preregistration, Bid Bond Required: 10%, Performance Bond Required: 100%, Payment Bond Required: 100%

Specifications

Specifications include, but are not limited to: This project includes constructing a 10.0 MG pre-stressed concrete domestic water storage tank on an existing CVWD tank site located at 72524 Vista Chino Drive approximately 1/2 mile east of Rio Del Sol Road in an unincorporated area of Riverside County known as Thousand Palms.Reservoir Site Work: The reservoir site work shall consist of all utility location and verification (excavating, exposing, and verifying top, bottom, and side of utility facility); earthwork and site work including excavating, importing, exporting, trenching, scarifying, backfilling, placing, filling, compacting, and grading all soil and rock materials onsite; restoring all areas not intended to be altered to pre-construction conditions (inside and outside project limits); transporting offsite all vegetation and deleterious material; furnishing and installing site piping and all related work; leakage and pressure testing pipelines; protecting in place or removing and replacing all existing utilities and public and private improvements; constructing storm drains, V-ditches, drainage swales, concrete inlets and outlets, rock rip-rap, and all drainage facilities; furnishing and installing crushed miscellaneous base; furnishing and installing asphalt concrete pavement and curbs, furnishing and installing site fencing, gates, and appurtenances; furnishing and installing all electrical service equipment, electrical panels, instrumentation and controls, lighting, conduit, and conductors; and all related work.Reservoir Work: The reservoir work shall consist of furnishing and erecting one (1) new 10.0 MG pre-stressed concrete potable water storage reservoir with appurtenances; furnishing all design calculations and fabrication drawings; furnishing and installing protective coatings on all exterior surfaces of the reservoir, including piping, appurtenances, and miscellaneous metal; shop and field testing; furnishing and installing reservoir inlet and outlet piping; furnishing and installing reservoir drain and overflow piping; leakage and pressure testing pipelines; and all related work.The Work shall consist of furnishing all plant, tools, equipment, materials, supplies, and manufactured articles and furnishing all labor, transportation and services, including fuel, power, water, and essential communications, and performing all work, or other operations required for the fulfillment of the Contract in strict accordance with the Contract Documents. The Work shall be complete, and all work, materials, and services not expressly indicated or called for in the Contract Documents, which may be necessary for the complete and proper construction of the work in good faith shall be provided by the Contractor as though originally so indicated, at no increase in cost to the CVWD.

Bid Related Documents

Download Solicitation Notice

Product Codes: 91430, 91223, 90976, 95966, 91244, 96878, 96273

Agency Information


Issuing Agency: Coachella Valley Water District

State: California

Agency Type: State and Local

Contact: Brian Fogg 75-515 Hovley Lane East, Palm Desert, California, 92211

Phone: 760-398-2651

Email: bfogg@cvwd.org

< PREVIOUS PAGE

GET A FREE
MARKET
ANALYSIS

FREE Market Analysis


Get a FREE 90-Day Market Analysis and see the bids you’ve been missing

GET BIDS NOW