Owner Marie Niestrath
Currency US Dollar
Commodity ARCHITECTURAL SERVICES, RECREATION FACILITIES (PARKS, MARINAS, ETC) 9067210, CIVIL ENGINEERING SERVICES, GENERAL 9251720, Construction, Curb and Gutter (Includes Maintenance, Repair, and Removal) 9131900, Construction, Hike and Bike Trail 9122600, Environmental - Architectural 9062900, Environmental Engineering 9253500, ENVIRONMENTAL ENGINEERING 9253520, Facilities and Other Improvements, Drives, Parking Lots, Paths, Trails 9510700, General Construction: Management, Scheduling, Cost Estimation - Engineering 9254400, Site Assessment, Environmental 9268300
Estimated Contract Start Date 11-May-18

 

Timing Rules
Publish time 19-Jun-19 8:53 AM
Due date 16-Aug-19 2:00 PM
Estimated Award Date 16-Dec-19

 

Bidding Rules

 

Content
Name Value
1 Request for Proposal (RFP)  
1.1 Hamlin & Hickey Design Build Information  
The District of Columbia (“District”) Office of Contracting and Procurement (“OCP”), on behalf of Department of Energy and Environment (“DOEE”) is seeking a qualified Design Build (“DB”) Contractor to provide design and construction services for low impact development (“LID”) stormwater retrofits and to add aesthetic value to Hamlin Street and Hickey Lane. This project is to be located on the southeastern half of the block on Hamlin Street, NE and within the U.S. National Arboretum (“USNA”), along the western side of Hickey Lane NE and just north of the R Street NE entrance.

The funds for this project is from an Environment Protection Agency Grant. The Subcontracting Requirements will be meeting the six good faith efforts to subcontract with Disadvantaged Business Enterprises (DBE). Refer to Attachments J.15 and J.16 of the Solicitation for more details.

A Pre-Proposal/Site Visit Conference will occur on Tuesday, June 25, 2019 starting at 9:00 AM EST Project Site 1. Project Site 2 will follow. Refer to Section L.18 of the Solicitation document (PDF) for more information. The last day to submit questions is Thursday, July 18, 2019 at 12:00 PM EST. Refer to Section L.5 of the Solicitation document (PDF).

*Start uploading documents to Ariba e-Sourcing at least four (4) business days prior to closing. If you have issues registering with Ariba e-Sourcing or issues with the site please contact Procurement Center of Excellence at ocp.helpdesk@dc.gov or 202-724-4477.
 
1.1.1 Please see the attachments:

1. Solicitation document (PDF)
2. Attachment J.1 SCP Construction
3. Attachment J.2 Davis-Bacon Wage Determination
4. Attachment J.3 EEO Form can be found under Section 4.6
5. Attachment J.5 Living Wage Notice can be found under Section
6. Attachment J.6 Living Wage Fact Sheet can be found under Section
7. Attachment J.7 Tax Certification Affidavit can be found under Section 4.7
8. Attachment J.8 Bidder/Offeror can be found under Section 4.9
9. Attachment J.9 Bid Bond can be found under Section 4.16
10. Attachment J.10 Performance Bond can be found under Section 4.17
11. Attachment J.11 Payment Bond can be found under Section 4.18
12. Attachment J.12 Certification Regarding Lobbying can be found under Section 4.20
13. Attachment J.13 Price Breakdown and Price Retainage can be found under Section 3.2
14. Attachment J.14 Detailed Price Schedule can be found under Section 3.1
15. Attachment J.15 DBE Outreach Spreadsheet can be found under Section 4.6
16. Attachment J.16 Design Build Agreement can be found under Section 4.2
17. Attachment J.17 Hickey Run Settlement Agreement between DOEE and DC Water
18. Attachment J.18 Federal Requirements and Suspension Form can be found under Section 4.19
Please see the attachments:

1. Solicitation document (PDF)
2. Attachment J.1 SCP Construction
3. Attachment J.2 Davis-Bacon Wage Determination
4. Attachment J.3 EEO Form can be found under Section 4.6
5. Attachment J.5 Living Wage Notice can be found under Section
6. Attachment J.6 Living Wage Fact Sheet can be found under Section
7. Attachment J.7 Tax Certification Affidavit can be found under Section 4.7
8. Attachment J.8 Bidder/Offeror can be found under Section 4.9
9. Attachment J.9 Bid Bond can be found under Section 4.16
10. Attachment J.10 Performance Bond can be found under Section 4.17
11. Attachment J.11 Payment Bond can be found under Section 4.18
12. Attachment J.12 Certification Regarding Lobbying can be found under Section 4.20
13. Attachment J.13 Price Breakdown and Price Retainage can be found under Section 3.2
14. Attachment J.14 Detailed Price Schedule can be found under Section 3.1
15. Attachment J.15 DBE Outreach Spreadsheet can be found under Section 4.6
16. Attachment J.16 Design Build Agreement can be found under Section 4.2
17. Attachment J.17 Hickey Run Settlement Agreement between DOEE and DC Water
18. Attachment J.18 Federal Requirements and Suspension Form can be found under Section 4.19
1.2 Amendments to this Soliciation  
Amendments will be posted below. IF an Amendment is issued the Offeror must fill out boxes 8, 15A, 15B, and 15C. Don't forget to upload your signed Amendment(s) before the closing period.  
1.2.1 Amendment 0001 - Updated Section C & F
Amendment 0002 - Added Attachment J.20 Utility Maps (2 PDF and 1 CAD drawing)
Amendment 0003 - Extend L.5 and Closing Date
Amendment 0004 - Extend L.5 and Closing Date
Amendment 0001 - Updated Section C & F
Amendment 0002 - Added Attachment J.20 Utility Maps (2 PDF and 1 CAD drawing)
Amendment 0003 - Extend L.5 and Closing Date
Amendment 0004 - Extend L.5 and Closing Date
1.3 Upload all completed and signed Amendment(s) here. Make sure you filled out Boxes 8, 15A, 15B, and 15C before attaching your completed Amendment(s).
2 B.3 PRICE SCHEDULE  
Enter your prices for each CLIN below.  
2.1 B.3.1 BASE YEAR (12 months from Date of Award)  
2.1.1 0001 - Project Management as outlined in Section C.5.1.1 below  
Price
Quantity 1 each
Extended Price
2.1.2 0002 - Current Project Area Assessment as outlined in Section C.5.1.2 below.  
Price
Quantity 1 each
Extended Price
2.1.3 0003 - Creation and Refinement of Concept Designs as outlined in Section C.5.1.3.1 below.  
Price
Quantity 1 each
Extended Price
2.1.4 0004 - Creation and Refinement of Semi-Final Designs as outlined in Section C.5.1.3.2 below.  
Price
Quantity 1 each
Extended Price
2.1.5 0005 - Creation and Refinement of Final Designs as outlined in Section C.5.1.3.3 below.  
Price
Quantity 1 each
Extended Price
2.1.6 0006 - Obtaining Approval and Permits as outlined in Section C.5.1.4 below.  
Price
Quantity 1 each
Extended Price
2.1.7 0007 - Construction of LID stormwater retrofits at Hamlin Street and Hickey Lane as outlined in Section C.5.2 below.  
Price
Quantity 1 each
Extended Price
2.2 B.3.2 OPTION YEAR ONE (12 months)  
Post Consruction  
2.2.1 1001 - As-Built Certification as outlined in Section C.5.3.1.1 below.  
Price
Quantity 1 each
Extended Price
2.2.2 1002 - Installation of Educational Signage as outlined in Section C.5.3.2 below  
Price
Quantity 1 each
Extended Price
2.2.3 1003 - Establishment of Vegetation as outlined in Section C.5.3.3 below.  
Price
Quantity 1 each
Extended Price
2.2.4 1004 - Establishment of LID Installation as outlined in Section C.5.3.4 below.  
Price
Quantity 1 each
Extended Price
2.2.5 1005 - Preparation and Submission of Close Out documents as outlined in Section C.5.3.5 below.  
Price
Quantity 1 each
Extended Price
3 Proposals  
3.1 Please provide your pricing and upload using the Detailed Price Schedule in Excel format here.
3.2 Please upload your your Price Proposal here here.

The Offeror can use this section to upload J.13, provide supporting description and or tables about their price.
3.3 Please upload your Technical Proposal here. Please make sure to include your Past Performance Evaluation forms, professional licenses, certifications, etc.  referenced under Section L.
3.4 Please upload the Redacted Version of your Technical Proposal here.
4 Compliance Documents  
Failure to submit complete compliance documents could result as a non-responsiveness submission.

If you are unable to provide compliance documents by the closing date please provide certified documentation with an explanation why.
 
4.1 Please see the attached Standard Contract Provisions of the District of Columbia.
4.2 Please see the attached Design Build Agreement of the District of Columbia.
4.3 Are the prices provided in your Price Proposal and Detailed Price Schedule consistent with the Department of Labor Wage Determination? See Section H.2 of the Solicitation document PDF.

Please click this link for the Department of Labor Wage Determination data: http://www.wdol.gov/
4.4 Have you read and fully understand the attached documents regarding the Living Wage Act of 2006?
4.5 If your price proposal total for the Base Year is $100k or more you must submit a complete Equal Employment Opportunity form here.
4.6 Please upload your DBE federal requirement here (see DBA attachment Section 8.2.4 ).

Attachment J.15 is an Excel spreadsheet to assist in finding DBE companies that are D.C. CBE companies. If you find other companies that are DBE certified you can add them to the list by categories.
4.7 Please complete the attached Tax Affidavit and upload here.
4.8 Please complete the attached Cost/Price Certification form and upload here.
4.9 Please complete the attached Bidder/Offeror Certification form and upload here.
4.10 Please upload a copy of your "Business License" issued by DC Department of Consumer and Regulatory Affairs (DCRA).
(If you are not registered to do business in the District please refer to http://dcra.dc.gov/ for further assistance).

If the Offeror is submitting a proposal as a joint venture or a teaming agreements make sure to check with DSLBD and register as a joint venture.  Upload all certifications, licensures, and copies of joint venture and teaming agreements here.

If your company is not required by the District to obtain a DC license please upload the evidence here.
4.11 Please upload a copy of your "Certificate of Good Standing" issued by DC Department of Consumer and Regulatory Affairs (DCRA).
(If you are not registered to do business in the District please refer to http://dcra.dc.gov/ for further assistance).

If your company is not required by the District to obtain this document please upload the evidence.
4.12 Please upload your most current Certificate of Liability Insurance here.

**Please make sure that the Government of the District of Columbia will be the certificate holder. Go to Section I.8 Insurance of the Solicitation document (PDF) for guidance.
4.13 Please complete and upload the Vendor Information Form here.
4.14 If you have not submitted your W9 in the past year to DOEE, please complete the attached form and upload here.
4.15 If you have not submitted a Master Supplier Form to DOEE since Jan. 2019 you are required to submit the form here.
4.16 Bid Bond. (see Attachment J.9 on the Solicitation document PDF). Upload your Bid Bond here.
4.17 Performance Bond. (see Attachment J.10 on the Solicitation document PDF). Upload your Performance Bond here.
4.18 Payment Bond. (see Attachment J.11 on the Solicitation document PDF). Upload your Payment Bond here.
4.19 Federal Requirement and Suspension Form. (see Attachment J.18 on the Solicitation document PDF). Upload your Federal Requirement and Suspension Form here.
4.20 Certification Regarding Lobbying. (see Attachment J.12 on the Solicitation document PDF). Upload your Certification Regarding Lobbying here.

 

 

Scoring
Name Weight
Totals 100%
1 Request for Proposal (RFP) 0%
1.1 Hamlin & Hickey Design Build Information 0%
The District of Columbia (“District”) Office of Contracting and Procurement (“OCP”), on behalf of Department of Energy and Environment (“DOEE”) is seeking a qualified Design Build (“DB”) Contractor to provide design and construction services for low impact development (“LID”) stormwater retrofits and to add aesthetic value to Hamlin Street and Hickey Lane. This project is to be located on the southeastern half of the block on Hamlin Street, NE and within the U.S. National Arboretum (“USNA”), along the western side of Hickey Lane NE and just north of the R Street NE entrance.

The funds for this project is from an Environment Protection Agency Grant. The Subcontracting Requirements will be meeting the six good faith efforts to subcontract with Disadvantaged Business Enterprises (DBE). Refer to Attachments J.15 and J.16 of the Solicitation for more details.

A Pre-Proposal/Site Visit Conference will occur on Tuesday, June 25, 2019 starting at 9:00 AM EST Project Site 1. Project Site 2 will follow. Refer to Section L.18 of the Solicitation document (PDF) for more information. The last day to submit questions is Thursday, July 18, 2019 at 12:00 PM EST. Refer to Section L.5 of the Solicitation document (PDF).

*Start uploading documents to Ariba e-Sourcing at least four (4) business days prior to closing. If you have issues registering with Ariba e-Sourcing or issues with the site please contact Procurement Center of Excellence at ocp.helpdesk@dc.gov or 202-724-4477.
 
1.1.1 Please see the attachments:

1. Solicitation document (PDF)
2. Attachment J.1 SCP Construction
3. Attachment J.2 Davis-Bacon Wage Determination
4. Attachment J.3 EEO Form can be found under Section 4.6
5. Attachment J.5 Living Wage Notice can be found under Section
6. Attachment J.6 Living Wage Fact Sheet can be found under Section
7. Attachment J.7 Tax Certification Affidavit can be found under Section 4.7
8. Attachment J.8 Bidder/Offeror can be found under Section 4.9
9. Attachment J.9 Bid Bond can be found under Section 4.16
10. Attachment J.10 Performance Bond can be found under Section 4.17
11. Attachment J.11 Payment Bond can be found under Section 4.18
12. Attachment J.12 Certification Regarding Lobbying can be found under Section 4.20
13. Attachment J.13 Price Breakdown and Price Retainage can be found under Section 3.2
14. Attachment J.14 Detailed Price Schedule can be found under Section 3.1
15. Attachment J.15 DBE Outreach Spreadsheet can be found under Section 4.6
16. Attachment J.16 Design Build Agreement can be found under Section 4.2
17. Attachment J.17 Hickey Run Settlement Agreement between DOEE and DC Water
18. Attachment J.18 Federal Requirements and Suspension Form can be found under Section 4.19
1.2 Amendments to this Soliciation 0%
Amendments will be posted below. IF an Amendment is issued the Offeror must fill out boxes 8, 15A, 15B, and 15C. Don't forget to upload your signed Amendment(s) before the closing period.  
1.2.1 Amendment 0001 - Updated Section C & F
Amendment 0002 - Added Attachment J.20 Utility Maps (2 PDF and 1 CAD drawing)
Amendment 0003 - Extend L.5 and Closing Date
Amendment 0004 - Extend L.5 and Closing Date
1.3 Upload all completed and signed Amendment(s) here. Make sure you filled out Boxes 8, 15A, 15B, and 15C before attaching your completed Amendment(s). 0%
2 B.3 PRICE SCHEDULE 0%
Enter your prices for each CLIN below.  
2.1 B.3.1 BASE YEAR (12 months from Date of Award) 0%
2.1.1 0001 - Project Management as outlined in Section C.5.1.1 below 0%

Price

0%

Quantity

0%

Extended Price

0%
2.1.2 0002 - Current Project Area Assessment as outlined in Section C.5.1.2 below. 0%

Price

0%

Quantity

0%

Extended Price

0%
2.1.3 0003 - Creation and Refinement of Concept Designs as outlined in Section C.5.1.3.1 below. 0%

Price

0%

Quantity

0%

Extended Price

0%
2.1.4 0004 - Creation and Refinement of Semi-Final Designs as outlined in Section C.5.1.3.2 below. 0%

Price

0%

Quantity

0%

Extended Price

0%
2.1.5 0005 - Creation and Refinement of Final Designs as outlined in Section C.5.1.3.3 below. 0%

Price

0%

Quantity

0%

Extended Price

0%
2.1.6 0006 - Obtaining Approval and Permits as outlined in Section C.5.1.4 below. 0%

Price

0%

Quantity

0%

Extended Price

0%
2.1.7 0007 - Construction of LID stormwater retrofits at Hamlin Street and Hickey Lane as outlined in Section C.5.2 below. 0%

Price

0%

Quantity

0%

Extended Price

0%
2.2 B.3.2 OPTION YEAR ONE (12 months) 0%
Post Consruction  
2.2.1 1001 - As-Built Certification as outlined in Section C.5.3.1.1 below. 0%

Price

0%

Quantity

0%

Extended Price

0%
2.2.2 1002 - Installation of Educational Signage as outlined in Section C.5.3.2 below 0%

Price

0%

Quantity

0%

Extended Price

0%
2.2.3 1003 - Establishment of Vegetation as outlined in Section C.5.3.3 below. 0%

Price

0%

Quantity

0%

Extended Price

0%
2.2.4 1004 - Establishment of LID Installation as outlined in Section C.5.3.4 below. 0%

Price

0%

Quantity

0%

Extended Price

0%
2.2.5 1005 - Preparation and Submission of Close Out documents as outlined in Section C.5.3.5 below. 0%

Price

0%

Quantity

0%

Extended Price

0%
3 Proposals 0%
3.1 Please provide your pricing and upload using the Detailed Price Schedule in Excel format here. 0%
3.2 Please upload your your Price Proposal here here.

The Offeror can use this section to upload J.13, provide supporting description and or tables about their price.
0%
3.3 Please upload your Technical Proposal here. Please make sure to include your Past Performance Evaluation forms, professional licenses, certifications, etc.  referenced under Section L. 0%
3.4 Please upload the Redacted Version of your Technical Proposal here. 0%
4 Compliance Documents 0%
Failure to submit complete compliance documents could result as a non-responsiveness submission.

If you are unable to provide compliance documents by the closing date please provide certified documentation with an explanation why.
 
4.1 Please see the attached Standard Contract Provisions of the District of Columbia. 0%
4.2 Please see the attached Design Build Agreement of the District of Columbia. 0%
4.3 Are the prices provided in your Price Proposal and Detailed Price Schedule consistent with the Department of Labor Wage Determination? See Section H.2 of the Solicitation document PDF.

Please click this link for the Department of Labor Wage Determination data: http://www.wdol.gov/
0%
4.4 Have you read and fully understand the attached documents regarding the Living Wage Act of 2006? 0%
4.5 If your price proposal total for the Base Year is $100k or more you must submit a complete Equal Employment Opportunity form here. 0%
4.6 Please upload your DBE federal requirement here (see DBA attachment Section 8.2.4 ).

Attachment J.15 is an Excel spreadsheet to assist in finding DBE companies that are D.C. CBE companies. If you find other companies that are DBE certified you can add them to the list by categories.
0%
4.7 Please complete the attached Tax Affidavit and upload here. 0%
4.8 Please complete the attached Cost/Price Certification form and upload here. 0%
4.9 Please complete the attached Bidder/Offeror Certification form and upload here. 0%
4.10 Please upload a copy of your "Business License" issued by DC Department of Consumer and Regulatory Affairs (DCRA).
(If you are not registered to do business in the District please refer to http://dcra.dc.gov/ for further assistance).

If the Offeror is submitting a proposal as a joint venture or a teaming agreements make sure to check with DSLBD and register as a joint venture.  Upload all certifications, licensures, and copies of joint venture and teaming agreements here.

If your company is not required by the District to obtain a DC license please upload the evidence here.
0%
4.11 Please upload a copy of your "Certificate of Good Standing" issued by DC Department of Consumer and Regulatory Affairs (DCRA).
(If you are not registered to do business in the District please refer to http://dcra.dc.gov/ for further assistance).

If your company is not required by the District to obtain this document please upload the evidence.
0%
4.12 Please upload your most current Certificate of Liability Insurance here.

**Please make sure that the Government of the District of Columbia will be the certificate holder. Go to Section I.8 Insurance of the Solicitation document (PDF) for guidance.
0%
4.13 Please complete and upload the Vendor Information Form here. 0%
4.14 If you have not submitted your W9 in the past year to DOEE, please complete the attached form and upload here. 0%
4.15 If you have not submitted a Master Supplier Form to DOEE since Jan. 2019 you are required to submit the form here. 0%
4.16 Bid Bond. (see Attachment J.9 on the Solicitation document PDF). Upload your Bid Bond here. 0%
4.17 Performance Bond. (see Attachment J.10 on the Solicitation document PDF). Upload your Performance Bond here. 0%
4.18 Payment Bond. (see Attachment J.11 on the Solicitation document PDF). Upload your Payment Bond here. 0%
4.19 Federal Requirement and Suspension Form. (see Attachment J.18 on the Solicitation document PDF). Upload your Federal Requirement and Suspension Form here. 0%
4.20 Certification Regarding Lobbying. (see Attachment J.12 on the Solicitation document PDF). Upload your Certification Regarding Lobbying here. 0%