Government Contract | Louisiana
WILLET LOOP ROAD and ROCK HILL ROAD BRIDGES

Find Open Contracts in the Architecture and Engineering Industry

Find Contracts Now

Bid Information


Bid Alert No: 00000472163

Bid Title: WILLET LOOP ROAD and ROCK HILL ROAD BRIDGES

Agency Bid No. Title: H.010592.6-R1

Received Date: 01/29/2016

Close Date: 02/24/2016

Purchase Type: Not Stated

Delivery Point:

Delivery Date: Not Stated

Specifications

Specifications include, but are not limited to:Subsection 108.04, Prosecution of Work of theStandard Specifications as amended by the supplemental specifications thereto, is deleted andreplaced by the following. 108.04(a) General The contractor shall provide sufficient materials, equipment, and labor to complete theproject in accordance with the plans and specifications within the contract time. If the completedwork is behind the approved progress schedule, the contractor shall take immediate steps torestore satisfactory progress and shall not transfer equipment or forces from uncompleted workwithout prior notice to, and approval of, the engineer. Each item of work shall be prosecuted tocompletion without delay. If prosecution of the work is discontinued for an extended period oftime, the contractor shall give the engineer written notice at least 24 hours before resumingoperations. 108.04(b) Progress and Disqualification The contractor's progress will be determined monthly at the time of each partial estimate,and will be based on the total amount earned by the contractor as reflected by the partialestimate. If the contractor's progress is more than 20 percent behind the elapsed contract time,the contractor may be notified that he is not prosecuting the work in an acceptable manner. Ifrequested by the Department the contractor must meet with and provide the project engineer withan acceptable written plan which details how the contractor will regain lost progress andprosecute the remaining work.A contractor shall be immediately disqualified when, on two or more projects, the contractor isin default in accordance with Subsection 108.09(a) and its progress on each such project isdeficient by 10 percent or more. The contractor shall remain disqualified until only one overdueproject remains incomplete and it has achieved final acceptance of the other project(

Bid Related Documents

Download Document

Bid Related Attachments

Download Attachment

Product Codes: 57028, 91313, 91430, 96884, 91381, 91219, 91223, 91244, 91396, 91395, 91361, 91339, 98852

Agency Information


Issuing Agency: State of Louisiana - Department of Transportation and Development (DOTD)

State: Louisiana

Agency Type: State and Local

Contact: Alfonzo Simon 1212 East Highway Drive, PO Box 94245, Room N-204, Baton Rouge, Louisiana, 70804

Phone: 225-379-1111

Fax: 225-379-1857

Email: alfonzo.simon@la.gov

< PREVIOUS PAGE

GET A FREE
MARKET
ANALYSIS

FREE Market Analysis


Get a FREE 90-Day Market Analysis and see the bids you’ve been missing

GET BIDS NOW