Government Contract | Montana
Water main improvements

Find Open Contracts in the Architecture and Engineering Industry

Find Contracts Now

Bid Information

Bid Alert No: 00000489684

Bid Title: Water main improvements

Agency Bid No. Title: Not Stated

Received Date: 02/18/2016

Close Date: 02/29/2016

Purchase Type: 45 Calendar Days

Delivery Point: Whitefish, Montana

Delivery Date: Not Stated

Special Notices: Pre-Bid Conference 02/22/2016 01:00 PM


Specifications include, but are not limited to: The proposed work includes water main improvements at two separate locations within Whitefish, MT: 1)New water main installation from Highway 93 to Lion Mountain Loop Road. The new main will run between Highway 93 and Lion Mountain Loop Road near Meadowlark Lane in Whitefish, MT. The proposed work generally includes water main construction, PRV installation, roadway excavation, backfill, asphalt patching, restoration and seeding, and miscellaneous improvements. 2) New water main installation from 40 feet south of the Columbia avenue bridge, north to midblock between the bridge and Riverside Avenue in Whitefish, MT. The proposed work generally includes water main construction, bridge backwall penetration, pipe hanger assembly, water service construction, roadway excavation, surfacing removal and replacements, and miscellaneous improvements.

Bid Related Documents

Download Document

Product Codes: 91339, 91340, 91360, 91345

Agency Information

Issuing Agency: City of Whitefish

State: Montana

Agency Type: State and Local

Contact: Jon Gass P.O. Box 158, Whitefish, Montana, 59937

Phone: 406-728-4611




FREE Market Analysis

Get a FREE 90-Day Market Analysis and see the bids you’ve been missing