Wastewater Treatment Plant and Pump Station Infrastructure Upgrade Program

Bid Information

Bid Alert No: 00000449946

Bid Title: Wastewater Treatment Plant and Pump Station Infrastructure Upgrade Program

Agency Bid No. Title: Not Stated

Received Date: 12/29/2015

Close Date: 01/15/2016

Purchase Type: Not Stated

Delivery Point: Lynwood, Washington

Delivery Date: Not Stated

Special Notices: Bidder Preregistration


Specifications include, but are not limited to:The work to be performed consists of preparing preliminary engineering and PS&E. Consultant services may also include but are not limited to: alternative evaluation, development of a preferred alternative, environmental planning/documentation, right of way/easement/permit acquisition services, community involvement, geotechnical engineering, traffic studies, surveying, bid process support, engineering support during construction and other related tasks. Engineering fees may vary subject to detail scope of work to be negotiated with the selected firm(s). Please refer to the citys website at for additional information. The anticipated timeframe for the services to be rendered is 2016-2017, but work orders executed during this term may extend beyond this timeframe subject to actual needs. Consultants will be considered for the following separate projects: 1)Wastewater Treatment Plant Hillside Slope Assessment, $50,000 - $150,000 The City desires to assess the stability of various steep slopes located around the vicinity of the Lynnwood Waste Water Treatment Plant located at 17000 76th Avenue W, Edmonds, 98026. Work tasks may include but are not limited to site investigations, conducing soil borings, identifying potential geotechnical hazards, developing technical memorandum for slope stabilization recommendations, field surveying, base mapping, wall type/size/location alternative analysis, preliminary wall design, preparation of plans, specifications, cost estimates, slope planting plans/details, environmental documentation, obtaining permits, preparation of property easements and other related documents, and construction management/testing services. 2)Wastewater Treatment Plant and Pump Station Infrastructure Upgrade Program, $50,000 - $300,000 annually Periodically, the need arises to conduct various Wastewater Treatment Plant and pump station infrastructure improvements. Work tasks may include but are not limited to site investigations, developing technical memorandum, field surveying, base mapping, alternative analysis, preparation of plans, specifications, cost estimates, environmental documentation, obtaining permits, and construction management/testing services. Specific tasks will be determined as the need arises

Bid Related Documents

Download Document

Bid Related Attachments

Download Attachment

Product Codes: 92549, 92508, 92518

Agency Information

Issuing Agency: City of Lynnwood

State: Washington

Agency Type: State and Local

Contact: Jeff Elekes Purchasing and Contracts Division, P.O. Box 5008, Lynnwood, Washington, 98046

Phone: 425-670-5205