Government Contract | Oklahoma
truck conversion

Find Open Contracts in the Architecture and Engineering Industry

Find Contracts Now

Bid Information

Bid Alert No: 00000473143

Bid Title: truck conversion

Agency Bid No. Title: 0400000154

Received Date: 01/29/2016

Close Date: 02/25/2016

Purchase Type: Not Stated

Delivery Point: Oklahoma

Delivery Date: Not Stated

Special Notices: Bidder Preregistration


Specifications include, but are not limited to:C.1. General DescriptionC.1.1. Oklahoma Forestry Services recently acquired two (2) military-equipped Freightliner 6x4 tractor trucks. We require the conversion of these 6x4 tractor trucks into suitable transport trucks capable of legally carrying Oklahoma Forestry Services ...C.2. Frame and Axle ModificationsC.2.1. Frame and axle modifications to the tractors must support the custom built dovetail bed with hydraulic ramps and the specially equipped firefighting dozers used by OFS. The dozers weigh up to 13 tons. Frame modifications must meet legal lengt...C.3. Dovetail Bed with Hydraulic RampsC.3.1. Scope These requirements and specifications are intended to construct two (2) identical beds capable of hauling bulldozers for Oklahoma Department of Agriculture, Food, and Forestry - Forestry Services. Each bed must be capable of supporting...C.4. General dimensions of each bedC.4.1. Bed is 264 (22) long and 101 (8 5) wide with the flat part being 192 (16) with two (2) sloping rear dovetail sections. (Added 28 to original length dimension bid in November 2014.)C.4.2. Clearance of rear bed shall be approximately 27 at the bottom of the rear bumper.C.4.3. A four (4) inch headboard, 80 (6 8) wide shall be welded to front of bed. This leaves a 4 gap between cab and headboard.C.5. FrameC.5.1. 6 x 2 x rectangular tubing is to be used as cross members on the flat part of the bed on 18 centers. The same rectangular tubing, 6 x 2 x , is to be used as spacers between the cross members on the x 3 flat bar.C.5.2. 3/8 x 8 flat bar shall be running the length of the bed, capping rectangular tubing cross members. Bottom edge of flat bar should be flush with bottom of 6 x 2 x rectangular tubing, top of 3/8 x 8 flat bar should be 2 above cross m...C.5.3. Four (4) 5/8 U-bolts shall be located on each side.C.5.4. 2 x 2 x 3/8 angle reinforcement shall run parallel to the flat bar side rail and flush with the top of the cross members. The angle reinforcement shall be installed halfway between the truck frame and the flat bar side rail, except at the t...C.5.5. The framing for the dovetail sections has 6 x 2 x cross member at breaks and at the rear with eight (4 on each side) 6 x 2 x rectangular tubing running longitudinally in each section.C.6. FloorC.6.1. tread plate floor shall be on flat part of bed. Pieces are to be joined at center of cross member tubes. Weld joint shall be solid. Sides are to be stitch welded 2 on 8 centers to the 3/8 x 8 sideboard.C.6.2. Inside the side rail, install five (5) 1-5/8 x 3 stake pockets on each side evenly spaced on the flat part of the bed. No stake pockets at the wheels.C.6.3. 2 x 3 x x 24 angel for treads will cover the longitudinal 6 x 2 x tubes in the two dovetail sections. These will be approximately 6/13 center to center with the 2 side to the front. The angles should extend 5 feet up to the flat p...C.6.4. The middle section of the dovetail will be covered with grated expanded metal to maximize traction while walking up the incline.

Bid Related Documents

Download Document

Product Code: 92833

Agency Information

Issuing Agency: State of Oklahoma - Office of Management and Enterprise Services

State: Oklahoma

Agency Type: State and Local

Contact: Jeffery Finlay, Central Purchasing Central Purchasing, 5005 N. Lincoln Blvd., Suite 300, Oklahoma City, Oklahoma, 73105

Phone: 405-522-2666

Fax: 405-521-4475




FREE Market Analysis

Get a FREE 90-Day Market Analysis and see the bids you’ve been missing