Government Contract | Connecticut
Third Party Code Compliance Review for Stratford High School Additions & Renovations

Bid Information

Bid Alert No: 00000560302

Bid Title: Third Party Code Compliance Review for Stratford High School Additions & Renovations

Agency Bid No. Title: 2016-018

Received Date: 05/03/2016

Close Date: 06/02/2016

Purchase Type: Not Stated

Delivery Point: Stratford, Connecticut

Delivery Date: Not Stated


Specifications include, but are not limited to: The project will be constructed in three major phases to enable the majority ofthe complex to remain occupied during the school year. In the first phase, anew, 130,000gsf, three-story West Building will be built on the west parcel. Apedestrian bridge will be constructed over King Street to connect the WestBuilding to the rest of the school. In the second phase, the east side of theexisting building will be demolished, and the New East Building will beconstructed. In the third phase, the remaining portion of the existing school willbe renovated and expanded. Much of this phase will occur during the summersof the first two phases; the remainder of the work will occur after the secondphase. In order to maintain the construction type of the existing building (TypeIIB as defined by the Connecticut State Building Code) a three-hour fire wall willbe constructed between the existing building to be renovated and the NewEast Building.

Bid Related Documents

Download Document

Product Codes: 92517, 92516

Agency Information

Issuing Agency: Town of Stratford

State: Connecticut

Agency Type: State and Local

Contact: Michael Bonnar, Purchasing Department 2725 Main Street, Stratford, Connecticut, 06615

Phone: 203-385-4044

Fax: 203-385-4046




FREE Market Analysis

Get a FREE 90-Day Market Analysis and see the bids you’ve been missing