Government Contract | Georgia
Terminal Area Improvements Phase 2 Project at the Lee Gilmer Memorial Airport

Find Open Contracts in the Architecture and Engineering Industry

Find Contracts Now

Bid Information


Bid Alert No: 00000483588

Bid Title: Terminal Area Improvements Phase 2 Project at the Lee Gilmer Memorial Airport

Agency Bid No. Title: Not Stated

Received Date: 02/12/2016

Close Date: 03/03/2016

Purchase Type: Not Stated

Delivery Point: Gainesville, Georgia

Delivery Date: Not Stated

Specifications

Specifications include, but are not limited to: The work generally consists of: removal of existing marking, pavement, and drainage structures; installation of a new slotted drain, junction manhole, drainage pipe and connection to an existing drop inlet; and installation of new aggregate base, pavement and marking.

Bid Related Documents

Download Solicitation Notice

Product Codes: 96861, 91276, 91396, 91395, 91360, 91345

Agency Information


Issuing Agency: City of Gainesville

State: Georgia

Agency Type: State and Local

Contact: 1137 Aviation Way, Gainesville, Georgia, 30501

Email: lcrosby@leadedgedesign.com

< PREVIOUS PAGE

GET A FREE
MARKET
ANALYSIS

FREE Market Analysis


Get a FREE 90-Day Market Analysis and see the bids you’ve been missing

GET BIDS NOW