Government Contract | Georgia
Stormwater Pipe Rehabilitation Project Cloister Subdivision

Find Open Contracts in the Architecture and Engineering Industry

Find Contracts Now

Bid Information


Bid Alert No: 00000408568

Bid Title: Stormwater Pipe Rehabilitation Project Cloister Subdivision

Agency Bid No. Title: 16-113BSW

Received Date: 11/03/2015

Close Date: 12/08/2015

Purchase Type: 15 days for completion

Delivery Point:

Delivery Date: Not Stated

Special Notices: Pre-Bid Conference Mandatory 11/16/2015 03:00 PM

Specifications

Specifications include, but are not limited to:The City of Peachtree City will be receiving separate sealed Bids for all material, labor and equipment for the Stormwater Pipe Rehabilitation Project Coventry Subdivision and Various Locations. This includes the following, with all related accessories as called for in the Contract Documents and Technical Specifications: The project consists of the trenchless rehabilitation (CCCP Lining Method) of 658 lineal feet of 36, 42, 48 and 54 diameter corrugated metal stormwater drainage pipe. The project is located within the Conventry Subdivision (near the Flat Creek Road and Ga. Hwy 54 intersection) and other various locations throughout the City

Bid Related Documents

Download Document

Amendments

Download Amendment

Product Codes: 91339, 91340, 91345

Agency Information


Issuing Agency: City of Peachtree

State: Georgia

Agency Type: State and Local

Contact: Purchasing Department, 151 Willowbend Road, Peachtree City, Georgia, 30269

< PREVIOUS PAGE

GET A FREE
MARKET
ANALYSIS

FREE Market Analysis


Get a FREE 90-Day Market Analysis and see the bids you’ve been missing

GET BIDS NOW