Government Contract | Texas
Stonewall Street Reconstruction (Terrell to Poplar) And Water Main Relocation

Find Open Contracts in the Architecture and Engineering Industry

Find Contracts Now

Bid Information


Bid Alert No: 00000576263

Bid Title: Stonewall Street Reconstruction (Terrell to Poplar) And Water Main Relocation

Agency Bid No. Title: 15-16-25

Received Date: 05/18/2016

Close Date: 05/24/2016

Purchase Type: WITHIN 60 WORKING DAYS

Delivery Point: Greenville, Texas

Delivery Date: Not Stated

Specifications

Specifications include, but are not limited to: 1 1 LS Mobilization (Max. 5% of Contract). Measurement andPayment shall consist of actual cost including: bonds andinsurance, transportation and setup for equipment,transportation and/or erection of all field offices, sheds andstorage facilities.2 1300 CY Remove and dispose of existing pavement to 7 depth,complete in place.3 59 Ton Furnish and install cement, complete in place.4 6000 SY Mix and compact cement into the existing subgrade at a rateof 10 lbs per square yard, complete in place.5 1350 Ton Furnish and install 4 Type B HMACcomplete in place per TxDOT Item 340.6 1013 Ton Furnish and install 3 Type D HMACcomplete in place per TxDOT Item 340.7 6 EA Adjust existing manholes to finished pavement gradecomplete in place8 3 EA Adjust existing valves and cleanouts to finished pavementgrade Complete in place9 100 LF Remove and replace 6 curb per City detail, complete inplace.10 1 LS Furnish and Install traffic control measures, complete inplace

Bid Related Documents

Download Document

Bid Related Attachments

Download Attachment

Product Codes: 91396, 91395, 91350, 91360, 91345

Agency Information


Issuing Agency: City of Greenville

State: Texas

Agency Type: State and Local

Contact: 2821 Washington Street, P.O. Box 1049, Greenville, Texas, 75401

Phone: 903-457-3177

< PREVIOUS PAGE

GET A FREE
MARKET
ANALYSIS

FREE Market Analysis


Get a FREE 90-Day Market Analysis and see the bids you’ve been missing

GET BIDS NOW