Government Contract | Washington
SR 16, TNB to SR 3 Congestion Study

Bid Information

Bid Alert No: 00000504464

Bid Title: SR 16, TNB to SR 3 Congestion Study

Agency Bid No. Title: Not Stated

Received Date: 03/09/2016

Close Date: 04/14/2016

Purchase Type: 2 year term

Delivery Point:

Delivery Date: Not Stated


Specifications include, but are not limited to:This congestion study is for SR 16 from Tacoma Narrows Bridge (MP 8.35) to SR 3 (MP 29.19) using Least Cost Planning methods. The work will include developing a Project Management Plan and Communication Plan. Reviewing and building on WSDOT Corridor Sketch baseline and context information for the SR 16 corridor. Holding stakeholder meetings and public meetings to identify issues and develop possible alternatives. Perform travel demand/traffic modeling on the corridor to look at existing and future conditions at 5, 10 and 20 years. Follow WSDOT Safety Guidance for Corridor Planning Studies. Complying with WSDOT goals and policies. Working with the stakeholders, develop and screen alternatives to identify and rank viable multimodal strategies to reduce the congestion and enhance safety along the corridor. Prepare a draft report, respond to and address/incorporate review comments, and prepare final report

Bid Related Documents

Download Document

Bid Related Attachments

Download Attachment Download Attachment

Product Codes: 95877, 92518

Agency Information

Issuing Agency: State of Washington - Department of Transportation

State: Washington

Agency Type: State and Local

Contact: Contract Ad & AwardAdministration Office, P.O. Box 47360, Olympia, Washington, 98504



FREE Market Analysis

Get a FREE 90-Day Market Analysis and see the bids you’ve been missing