Government Contract | Oregon
Southeast Interceptor 2S&3 Phase I Extension

Bid Information

Bid Alert No: 00000492913

Bid Title: Southeast Interceptor 2S&3 Phase I Extension

Agency Bid No. Title: SW0707

Received Date: 02/23/2016

Close Date: 03/10/2016

Purchase Type: Not Stated

Delivery Point:

Delivery Date: Not Stated

Special Notices: Pre-Bid Conference Mandatory 03/02/2016 01:00 PM


Specifications include, but are not limited to:The City of Bends 2014 Collection System Master Plan (CSMP) compiled by Murray Smithand Associates (MSA) identifies Phase I of the SEI as a primary capital improvement,designed to alleviate sewer capacity-deficient areas of Bend, to enable the decommissioningof City-owned pump stations, and to provide sewer service to homes in the southeast areaof the city.Completed sections of Phase I include sewer mains along Murphy Road to 15thStreet and along 15thStreet to Chloe Lane and Ferguson Road. Sections that are currentlyunder construction are along Ferguson Rd, King Solomon Ln, Orion Dr, and Camelot Pl.Future construction of Phase I segments includes the 27thStreet Sewer Line Project whichis aligned along the 27thSt. corridor between Reed Market Road and Medical Center Drive.This work will be performed in 2016 and 2017.Prospective planning has identified that the SEI requires an interim connection to thecurrent collection system in order to provide efficient utilization of its completed portions.MSAs sewer analysis technical review: Draft Technical Memorandum dated February 10,2016 is directly applicable to the SEI extension. This review identifies upsizing the sewerinfrastructure along an existing sewer main alignment that would accommodate anticipatedflows.This technical review includes the calculated flows anticipated by the CSMP, aprofile of projected flowlines based on pipe sizes, and an analysis of possible pipe sizesand slopes along the extension alignment. This technical review can be found on thePremier Builders Exchange website ObjectivesThe objective of this project is to design a gravity sewer main to connect the futureterminus of the SEI to the existing collection system.The location of this line will begin atthe intersection of Medical Center Dr and 27thSt and span approximately 6,000 feet to endat a sewer junction which borders the east side of Moody Park.MSAs technical reviewpresents supporting information and design parameters for the project.The City of Bend intends that other aspects of the project such as sewer and non-sewerrelated designs, project implementation, deliverables, and schedule be properly organizedand coordinated to ensure timely and efficient construction

Product Code: 92518

Agency Information

Issuing Agency: City of Bend

State: Oregon

Agency Type: State and Local

Contact: Gwen Chapman 710 NW Wall Street,, PO Box 431, Bend, Oregon, 97709

Phone: 541-385-6677




FREE Market Analysis

Get a FREE 90-Day Market Analysis and see the bids you’ve been missing