Government Contract | New Jersey
South Campus Fiber Optic Connection

Bid Information

Bid Alert No: 00000519887

Bid Title: South Campus Fiber Optic Connection

Agency Bid No. Title: B160020

Received Date: 03/22/2016

Close Date: 04/12/2016

Purchase Type: 91 days for completion

Delivery Point:

Delivery Date: Not Stated

Special Notices: Questions Due By 03/23/2016 09:00 AM, Pre-Bid Conference Optional 03/21/2016 11:00 AM


Specifications include, but are not limited to:Protection-Zone Fencing: Install protection-zone fencing along edges of protectionzones in a manner that will prevent people from easily entering protected area except byentrance gates.1. Posts: Set or drive posts into ground one-third the total height of the fence withoutconcrete footings. Where a post is located on existing paving or concrete toremain, provide appropriate means of post support acceptable to Architect.B. Repair or replace trees, shrubs, and other vegetation indicated to remain or be relocatedthat are damaged by construction operations, in a manner approved by Engineer.C. Maintain protection-zone fencing in good condition as acceptable to Engineer andremove when construction operations are complete and equipment has been removedfrom the site.3.3 EXCAVATIONA. General: Excavate at edge of protection zones and for trenches indicated withinprotection zones according to requirements in Section 312000 "Earthwork."B. Trenching near Trees: Where utility trenches are required within protection zones, handexcavate under or around tree roots or tunnel under the roots by drilling, auger boring,or pipe jacking. Do not cut main lateral tree roots or taproots; cut only smaller roots thatinterfere with installation of utilities. Cut roots as required for root pruning.C. Do not allow exposed roots to dry out before placing permanent backfill.3.4 ROOT PRUNINGA. Prune roots that are affected by temporary and permanent construction. Prune roots asfollows:1. Cut roots manually by digging a trench and cutting exposed roots with sharppruning instruments; do not break, tear, chop, or slant the cuts. Do not use abackhoe or other equipment that rips, tears, or pulls roots.2. Temporarily support and protect roots from damage until they are permanentlycovered with soil.3. Cover exposed roots with burlap and water regularly.4. Backfill as soon as possible according to requirements in Section 312000"Earthwork

Product Codes: 98815, 91438, 91597, 90976, 98852

Agency Information

Issuing Agency: Richard Stockton College (Stockton University)

State: New Jersey

Agency Type: State and Local

Contact: Purchasing Office, 101 Vera King Farris Drive BLDG 70, Galloway, New Jersey, 08205