Government Contract | Oregon
Solar Photovoltaic Renewable Resource

Bid Information

Bid Alert No: 00000571502

Bid Title: Solar Photovoltaic Renewable Resource

Agency Bid No. Title: Not Stated

Received Date: 05/12/2016

Close Date: 05/20/2016

Purchase Type: Not Stated

Delivery Point: Oregon

Delivery Date: Not Stated


Specifications include, but are not limited to:. Contractor shall provide all required services and materials for the successful completion of the Plant. Contractors responsibilities shall include environmental permitting, design, engineering, procurement of equipment, Site preparation work, foundations, installation of all equipment, bulk material and commodities supply, and Site finishing work. Contractor also shall deliver project management, construction management, commissioning and startup, and testing of work, all as described in this document including all referenced appendices and standards which will subsequently become a contract document.Contractor shall construct all roads, foundations, electrical systems, control systems, monitoring systems, communications, ancillary structures, storage facilities, security systems, and fencing, and shall erect and commission the photovoltaic (PV) system in the locations and orientations set forth in the Site plan and Site layout drawings and in accordance with this document, and all related specifications that relate thereto.Installation of the PV system shall be by a recognized, experienced Contractor in accordance with federal, state, local, and utility specifications and requirements and in accordance with the Utah Office of Energy Development. The electrical installation of the PV system shall be performed in accordance with the same requirements. The work shall be performed by an electrical contractor licensed in the state where the project will be constructed. The work shall be performed by a licensed solar photovoltaic contractor who has obtained written approval by the department of licensing (in the state where the project will be constructed) for the installation of solar PV systems. Contractor shall provide comprehensive onsite construction management for the Plant and shall commission the Plant. Contractor shall manage, supervise, inspect, and furnish all labor, equipment, materials, temporary structures, temporary utilities, products, and services related to the foregoing, all on a turnkey basis.

Product Codes: 91221, 90957, 91016, 96131

Agency Information

Issuing Agency: PacifiCorp

State: Oregon

Agency Type: State and Local

Contact: 825 NE Multnomah, Suite 600, Portland, Oregon, 97232




FREE Market Analysis

Get a FREE 90-Day Market Analysis and see the bids you’ve been missing