Government Contract | Texas
Side Seal Plate Replacement

Bid Information


Bid Alert No: 00001076092

Bid Title: Side Seal Plate Replacement

Agency Bid No. Title: 17-08-1046

Received Date: 08/31/2017

Close Date: 09/15/2017

Purchase Type: Term:

Delivery Point: Brazos River, Texas

Delivery Date: Not Stated

Special Notices: Questions Due By 09/06/2017 04:00 PM

Specifications

Specifications include, but are not limited to:OBJECTIVES1 Determine the condition and remaining useful service life of the concrete buttressesto which the side seal plates are attached, and the condition and remaining usefulservice life of the original grout fill. While grout fill will be removed for Flood Gate#2 repairs, the condition of the grout on the remaining gates may be sufficient toleave it in place2 Determine the extent to which the buttresses, reinforcing steel, steel embedmentsand anchorage for the side seal plates at Flood Gate #2 have deteriorated, and ifthose elements can be reused or must be removed3 Determine the means to temporarily (during the placement of the grout fillreplacement) and permanently anchor the replacement side seal plates to thebuttresses4 Using Lidar or similar precision measurement technology, determine the precisegeometry of the buttress walls that support the Flood Gate #2 side seal plates sothat the temporary and permanent anchorage and plate placement can be designedand constructed to the required tolerances5 Obtain construction plans for use byBRAs staff, and technical guidance fromdesigner during repair to concrete and installation of the new side seal plates forFlood Gate #26 Obtain design engineers opinion of conceptual changes to the Flood Gate #2construction plans when considering repairs to the other Flood Gate Side SealPlatesThe BRA requires the services of a professional engineering firm to assess the structuralcondition of the buttresses, reinforcing steel, side seal plate anchorage, and grout at FloodGate #2, and to design the replacement of the side seal plates. The Work will beconducted in three (3) phases as follows.1 INVESTIGATION PHASE to determine the condition of the existing components andthe useful life remaining2 DESIGN PHASE to develop construction plans, specifications and testingrecommendations for the replacement of Flood Gate #2 side seal plates3 CONSTRUCTION PHASE engineering services to support theBRAs reconstructionactivity, and to certify completionThe expected tasks to be accomplished in each phase are outlined below, subject torefinement by the selected engineering firm, resulting in the Scope of Work for thisContract.1 INVESTIGATION PHASEA Engineer shall review available plans and construction documents related to thebuttresses and side seal platesB Engineer shall review photographs taken during the on-going demolition of theside seal platesC Engineer shall identify materials to be sampled and tested, and the testingneeded for each, including but not limited to, the following.i. Buttress concrete and seal plate grouta. Petrographic analysisb. Chemical analysis (ASR/Sulfate attack/Carbonation etc.)c. Compressive and tensile strength (for use in anchorage design)ii. Buttress reinforcing steela. Location by echo, thermal or other meansb. Corrosion detectionc. Delamination detectioniii. Steel embedments and anchorsa. Corrosionb. DelaminationD Engineer to sound the wall following removal of the existing side seal plates andgrout to locate areas of potential deteriorationE Access for testing will be by scaffolding along the face of the pier wall providedby BRA.F Engineer will prepare a report of the INVESTIGATION includingrecommendations for the reuse or replacement of buttress concrete, buttressreinforcing steel, side seal plate anchors, and grout.

Bid Related Documents

Download Document

Amendments

Download Amendment

Product Code: 92578

Agency Information


Issuing Agency: Brazos River Authority

State: Texas

Agency Type: State and Local

Contact: Clarissa Cabrera BRA Central Office, 4600 Cobbs Drive, PO Box 7555, Waco, Texas, 76714

Email: clarissa.cabrera@brazos.org