Government Contract | California
SHROPSHIRE, SEABREEZE, AND WESTON GREENBELT REWIRING

Bid Information


Bid Alert No: 00000505308

Bid Title: SHROPSHIRE, SEABREEZE, AND WESTON GREENBELT REWIRING

Agency Bid No. Title: OM-16-034

Received Date: 03/09/2016

Close Date: 03/31/2016

Purchase Type: 30 days for completion

Delivery Point:

Delivery Date: Not Stated

Specifications

Specifications include, but are not limited to:The work to be performed consists of furnishing all labor, materials, tools,transportation, supplies, equipment, appurtenances, fuel, and power, unlessspecifically excepted, necessary to repair, replace, and restore the pathway lightinglocated throughout these areas to its original operating condition. It is the goal ofthis project that all work and repairs be performed in such a manner as to preventfuture vandalism to the lighting system due to theft of copper wires, conductors, andother materials.The contractor will be required to coordinate his start of work with the City. Theintent is to have the pull boxes and hand hole covers secured as soon as possibleafter the new wiring has been installed and lighting tested by the contractor.The work will consist of the following:A. Pulling new wires and reinstalling all necessary equipment, backfilling allstreetlight pull boxes with plastic sheeting, clean sand, roofing paper andcontrol-density fill (CDF) non-structural mix without aggregate, placing the lidon while wet and grouting between lid and rim (see Instructions forBackfilling Street Light Pull Boxes, Attachment B). Prior to filling, thecontractor must have the city inspector test all lights, any outlets and circuitsto verify all have been energized. Contractor should arrange for inspectionso that the new wires are not exposed overnight or while contractor is notpresent.Work shall be done and wire sized in accordance with the original SiteElectrical drawings and per City standards (using Attachment B for backfillingpull boxes).Contractor is responsible to provide all connections, materials andappurtenances as necessary to complete the work. Contractor shall repair alldamaged conduits. There may be damage to the ends of the conduits as aresult of the wires being forcibly removed from the conduits. Contractor shallrepair all conduits as necessary and install all missing end bells on conduitsas necessary. Contractor shall seal the ends of the conduits per Steps 1 and2 of Instructions for Backfilling Street Light Pull Boxes (Attachment B)

Product Code: 91438

Agency Information


Issuing Agency: City of Stockton

State: California

Agency Type: State and Local

Contact: City Hall, 425 North El Dorado Street, Stockton, California, 95202

< PREVIOUS PAGE

GET A FREE
MARKET
ANALYSIS

FREE Market Analysis


Get a FREE 90-Day Market Analysis and see the bids you’ve been missing

GET BIDS NOW