Government Contract | Georgia
Short Line Highway Pavement Marking Services District 6

Find Open Contracts in the Architecture and Engineering Industry

Find Contracts Now

Bid Information

Bid Alert No: 00000562105

Bid Title: Short Line Highway Pavement Marking Services District 6

Agency Bid No. Title: 48400-DOT0000543

Received Date: 05/04/2016

Close Date: 05/31/2016

Purchase Type: Not Stated

Delivery Point:

Delivery Date: Not Stated

Special Notices: Questions Due By 05/06/2016 03:00 PM, Bidder Preregistration


Specifications include, but are not limited to:The Contractor will be required to perform prep work, setup, traffic control, preparation, installation and cleanup for Short Line Highway Pavement Marking as defined in this ITB. The majority of the work will occur on the Interstate and State Route system. The Contractor shall supply sufficient labor, equipment, tools, means of transportation, traffic control, and incidentals to perform work in accordance to specifications, and to ensure a safe work environment for employees and the traveling public within the time schedule specified.ScopeWork under this Contract consists of furnishing all labor, materials, tools, equipment, means of transportation, and incidentals necessary to perform the services. Contractor must furnish equipment in good operating condition and operated by properly trained and qualified personnel. The Contractor must make a good faith effort to furnish the Department the fully operational equipment needed to perform Short Line Highway Pavement Marking at such time, and at such location(s) as directed by the Engineer. Prior to start of work, Contractor must inspect equipment to ensure it is in good condition. Equipment must be fully operational for the performance of its intended purpose. The Contractor will also be responsible for any traffic control, licenses, and permits required to satisfy the duties required herein.DeliverablesThe following deliverables are expected for work performed at the locations referenced in Table 3:The Contractor will perform Short Line Highway Pavement Marking Services at the locations provided per the specs checked in Table 6, Table 6.1, and Table 7.Quality AcceptanceThe services performed and products received shall be in accordance with GDOT specification guidelines and GDOT design criteria before the deliverables will be accepted.Work PlanThe Department will schedule applicable site visits to allow the Contractor to review the route and work section. The Contractor must provide a detailed Statement of Work that details the Contractors work plan for requested work for the applicable route(s). The Statement of Work must identify specific dimensions, locations, work quantities, work item costs, and timelines.The Contractors Statement of Work must adhere to the work schedule detailed in Table 9 Agreement Duration.Personnel and Sub-Contractors

Product Code: 96861

Agency Information

Issuing Agency: State of Georgia - Department of Transportation (GDOT)

State: Georgia

Agency Type: State and Local

Contact: Deborah Dunagan Office of Procurement, 600 West Peachtree Street, NW, Atlanta, Georgia, 30308

Phone: 770-387-3605




FREE Market Analysis

Get a FREE 90-Day Market Analysis and see the bids you’ve been missing