Government Contract | Missouri
Roof Replacement Multiple Locations North Scattered Sites

Bid Information

Bid Alert No: 00000401496

Bid Title: Roof Replacement Multiple Locations North Scattered Sites

Agency Bid No. Title: IFB-15-881

Received Date: 10/26/2015

Close Date: 11/20/2015

Purchase Type: Not Stated

Delivery Point: Kansas City, Missouri

Delivery Date: Not Stated

Special Notices: Pre-Bid Conference 10/28/2015 10:00 AM


Specifications include, but are not limited to:General Preparation:1. Remove roof covering (at any location with roof shingles) to deck including flashings around chimney, valley,ridge cap, vents, & turbine ventilators, gutter & down spouts and any other roof covering accessories and haul.2. Call the project manager for inspection and approval on each roof before proceeding to the next activity.3 Allow 6 sheets of 4 x 8x 5/8" thick plywood CDX for replacement of any damaged roof deck per unit.4. Provide a Unit price for the following:a. SF price for the replacement 5/8" thick plywood CDX roof deck.b. LF price for the removal and replacement of fascia boards or bargeboards.c. SF price for the removal and replacement of aluminum fascia and bargeboard wrapse. SF price for the removal and replacement of the Gutter & Down Spoutsf. LF price for the removal and replacement of the Gutter Guards.Furnish & Install:5. #30, asphalt roof felt underlayment.6. 6 Aluminum square roof vents per unit to meet Codes requirement of 1SF:150SF.7. Wind drives turbine ventilator(s) to replace the number of turbine ventilator(s) removed.8. (30yrs Limited Warranty) asphalt roof shingles: Use Malarkey Roof coverings (equal or better) roofing product.(Color - WEATHERED WOOD.)9. Roof ridge (cap) must be the same color and grade as the shingles.10. If Ventilation Ridge cap is on the old roof, use new Ventilation Ridge Cap along the ridge. (Example: Alongridge at 6917/6919 N. Fisk Ave.)10. Roof galvanized metal drip edges, drip edge and other roof covering accessories.11. 0.19 thick aluminum flashings around chimney stack, b-vent, valley and plumbing vents above the roof. Alsoinstall flashing around skylights and turbine ventilators.12. Use aluminum, stock unit 5 K type, 0.032 thick, plain gutter with matching 3x 4 down spout at locationswhere gutter & down spouts were removed.Notes:a. Attach down spouts to any existing buried drain pipe around the house.b. All down spouts at the ground elevation that were not attached to drain line mustextend with an elbow 24 long away from foundation wall and be properly placed over a concretesplash block. (The elbow of the extension must be free 2 from the ground elevation)c. Where two down spouts meet, use Y down spout connection or adapter to connect both down spouts.13. Install 6 wide Gutter Guards over the gutters around the roof. Follow manufacturer specification &instructions for installation. (Use Steel Powder coated Screen Gutter Guard by E-Z Lock Small Hole gutterguard [equal or better] product.).14. 48 long precast concrete splash block to each down spout and sump pump drain outlets around the unit.Remove any existing broken splash block or none comply with this specification and haul.15. Remove all demolished shingles and roof debris irrespective of their sizes. Use magnetic roller to remove nailsand other metal objects on the ground.16 Before Contractor start interior works, you are required to protect or cover the floors and residents belongingswith drop clothes from the entry to where work is required in the unit.17 Provide ladder for inspection during the progress of work hours and final inspection to inspect theroof gutters and guards installed.18 Obtain paint color and manufacturer of paint to use from the North S. Sites Property Manager.19 Clean all gutters and down spouts. After manually cleaning, spray with water hose to wash away all debrisfrom the gutters and down spouts.

Product Code: 91473

Agency Information

Issuing Agency: Kansas City Housing Authority

State: Missouri

Agency Type: State and Local

Contact: 920 Main Street, Suite 701, Kansas City, Missouri, 64105



FREE Market Analysis