Roadrunner Cafe Sewer Line Repairs

Bid Information

Bid Alert No: 00000517589

Bid Title: Roadrunner Cafe Sewer Line Repairs

Agency Bid No. Title: 2016900277

Received Date: 03/18/2016

Close Date: 04/06/2016

Purchase Type: MAY 12, 2016 THROUGH MAY 17, 2016

Delivery Point:

Delivery Date: Not Stated


Specifications include, but are not limited to:Roadrunner Caf Sewer Line RepairsSaw-cut concrete (approximately 410 Square Feet of concrete) and excavate approximately 80 feet of cast iron drain line including eight clean-outs. Saw-cut markings will be provided by UTSA staff, however if inaccuracies are found and additional cutting and excavation is needed, contractor shall provide an estimate. Estimate must be approved by UTSA personnel before change order is submitted. After change order is approved by UTSA, contractor may proceed with additional work.Excavation shall include complete exposure of sewage piping to include an additional 6 clearance directly below piping to facilitate proper backfilling.During removal and replacement of the sewer piping, the contractor shall be responsible for ensuring a continuous flow of waste. UTSA would strongly suggest that any actual replacing of piping be done at night when the Caf is closed. The soil shall be excavated to the extent that it is not visibly contaminated with grease. The soil shall be tested by a lab for contaminants, packaged into barrels or other suitable means, and disposed of properly by thecontractor. A m a n i f e s t a n d a c o p y o f t h e l a b p r o f i l e r e p o r t s h a l l b e p r o v i d e d t o U T S A s O f f i c e o f F a c i l i t i e s within 30 days of disposal. All new piping shall be PVC schedule 40 material. All connections between cast iron and PVC pipe shall installed with a Clamp-All HI-TORQ TORQ 125 couplings. Sand bedding shall be installed 6 below and above all new piping. Clean fill material shall be used for backfilling the excavated area. During all phases of work, the contractor shall ensure that proper fencing is erected around the excavated area. The contractor shall also ensure that proper shoring is in place in the excavated areas if required by the depth of the trench

Bid Related Documents

Download Document

Product Codes: 91468, 91339, 91345

Agency Information

Issuing Agency: University of Texas at San Antonio

State: Texas

Agency Type: State and Local

Contact: Sandra Calderon, Purchasing and Distribution Services Purchasing and Distribution Services, 1 UTSA Circle, San Antonio, Texas, 78249

Phone: 210-458-8680

Fax: 210-458-4061