Government Contract | Kentucky
RFB-261-16 KSU Boiler and Distribution Lines Frankfort KY

Find Open Contracts in the Architecture and Engineering Industry

Find Contracts Now

Bid Information

Bid Alert No: 00000551678

Bid Title: RFB-261-16 KSU Boiler and Distribution Lines Frankfort KY

Agency Bid No. Title: 1600000803

Received Date: 04/22/2016

Close Date: 05/19/2016

Purchase Type: Not Stated

Delivery Point:

Delivery Date: Not Stated

Special Notices: Pre-Bid Conference Optional 05/03/2016 09:00 AM


Specifications include, but are not limited to:The scope of the project includes replacing the steam piping in approximately 2600 feet of utility tunnels with hot water piping to serve 11different building heat exchangers. This project will remove the buildings from the central plant, and then connect them into two groups ofbuildings served by hot water boilers installed at Bell Gym and Blazer Library. Modifications to HVAC, electrical, and plumbing systems at thebuildings used for the boilers as well as modifying and replacing some existing equipment at the other buildings will be necessary to support theproject. In addition to the primary scope, two bid options have been proposed: (1) Modification of the HVAC units serving the open office (formerpool space) at Bell Gym to improve temperature control and energy usage, and (2) Demolition of the existing, non-operational coal boiler at theJordan Maintenance Building.Phasing for the two groups of boilers will be broken into three phases. Phase 1 will occur during the summer season of 2016 to get hot water tothe Group 1 buildings. Group 1 consists of Blazer Library, Hunter Hall, Jackson Hall, Carver Annex, Combs Hall, and McCullen Hall. Workinside Blazer will be planned during an unoccupied portion of the summer with the exception of the existing mechanical rooms and the newboiler room. Building work inside the other Group 1 buildings is limited to the mechanical rooms, and the work will be completed whenfunctioning hot water is brought to the building before October, 2016. Phase 2 will be an interim period of work over the heating season of Fall2016 to Spring 2017. Tunnel demolition work will occur during this period, and some preparation work at Bell Gym for the Group 2 boiler plantwill be done. A similar plan to Phase 1 will be developed for Phase 3 during the second summer (2017) of work for the Group 2 Bell Plant.Group 2 includes Bell Gym, Carver Hall, Hume Hall, Betty White, and Bradford Hall. Bell, Bradford, and Betty White have extensive insidepiping work in non-mechanical spaces that will be planned during unoccupied (or lower usage) periods

Bid Related Documents

Download Document


Download Amendment

Product Codes: 94125, 91438, 91450, 91468, 91388

Agency Information

Issuing Agency: Commonwealth of Kentucky - Department of Facilities and Support Services

State: Kentucky

Agency Type: State and Local

Contact: Amanda Greer 403 Wapping Street, 1st Floor, Frankfort, Kentucky, 40601

Phone: 502-782-8545



FREE Market Analysis

Get a FREE 90-Day Market Analysis and see the bids you’ve been missing