Government Contract | Virginia
Renovate Waller Depot Complex

Bid Information

Bid Alert No: 00000566368

Bid Title: Renovate Waller Depot Complex

Agency Bid No. Title: VAFM 16-0003D

Received Date: 05/11/2016

Close Date: 06/08/2016

Purchase Type: Not Stated

Delivery Point:

Delivery Date: Not Stated


Specifications include, but are not limited to: SCOPE OF SERVICES:The selected A/E shall furnish all expertise, labor and resources for design services beginning at Schematic and designing up through Preliminary (45-50%) period services for the project in accordance with the requirements of the A/E Manual. The following generally highlights the services that the A/E will be required to perform:The Architectural and Engineering firm shall have knowledge of the Bureau of Capital Outlay Managements Pool Funding Process. Ref: 2014 Special Session 1, Ch. 2, Construction and Detailed Planning Pools.Refine, clarify, and define the Agencys project description, data, and requirements as necessary to develop a Schematic design of the project which meets the Agencys requirements and is within the stipulated design-not-to-exceed construction cost. Submit and Respond to all BCOM and other agency review comments and resolve outstanding design issues at the various phases by taking appropriate action in the design of the project.Develop a Preliminary Design submission consistent with the requirements of the A/E Manual. Submit and Respond to all BCOM and other agency review comments and resolve outstanding design issues prior to submission of construction documents. Documents shall include all prior Schematic submission documents, as well as, an Independent Cost Estimate and VE Study.Provide complete construction contract documents with professional seals and signatures in accord with the procedures of the A/E Manual. Documents must be complete and ready for bidding not later than August 1, 2017.Note: These referenced services will be awarded upon the approval of the Schematic and Preliminary construction documents by the Bureau of Capital Outlay Management.E. Assure that the construction contract documents are in conformance with generally accepted architectural and engineering practices and comply fully with all applicable codes and regulations including, but not limited to, the Virginia Uniform Statewide Building Code, and the accessibility standards referenced in the CPSM.F. Provide specifications which reflect current requirements, standards and product availability.G. Develop and prepare construction documents for an Erosion and Sediment Control Plan and a Stormwater Management Plan. Obtain approvals from required Agencies.H. Where applicable, coordinate entrance design with and obtain approval from the Virginia Department of Transportation office having jurisdiction.I. Coordinate the design of utility connections with local utility provider and obtain necessary approvals. Agency will pay filing fees and connections charges, as required.J. Prepare A/E cost estimates for the project per the A/E Manual.

Bid Related Documents

Download Document

Product Code: 92516

Agency Information

Issuing Agency: Commonwealth of Virginia - Department of Military Affairs

State: Virginia

Agency Type: State and Local

Contact: Facilities Engineering and Management, Building #316, Fort Pickett, Blackstone, Virginia, 23824



FREE Market Analysis

Get a FREE 90-Day Market Analysis and see the bids you’ve been missing