Government Contract | Illinois
Professional Engineering Services for Construction Inspection Services for the Site/Civil Work at the Oak Park Station Development Project

Bid Information

Bid Alert No: 00000505880

Bid Title: Professional Engineering Services for Construction Inspection Services for the Site/Civil Work at the Oak Park Station Development Project

Agency Bid No. Title: Not Stated

Received Date: 03/08/2016

Close Date: 03/17/2016

Purchase Type: Not Stated

Delivery Point:

Delivery Date: Not Stated

Special Notices: Questions Due By 03/11/2016


Specifications include, but are not limited to:The Oak Park Station redevelopment project in the Village of Oak Park includes site civil work within Village of Oak Parks right of way for replacing existing sewer and water mains, creating a new street with new underground water and sewer mains, installing new street lighting, street resurfacing and reconstruction, and streetscaping as part of its approved permit. The Oak Park Station Development is located in an area bounded by North Boulevard to Lake Street and Harlem Avenue to Marion Street. The Village of Oak Parks Engineering Division of Public Works typically has responsibility for providing inspection for work within the right-of-way with development projects but due to existing workloads and the large amount of site/civil work associated with this project the Village is requesting proposals to perform these inspection services. The development currently has all approved Village building permits as well as MWRD and IEPA permits and is in the process of obtaining IDOT permits for work within the Harlem right-of-way. The project is being built by Tishman Construction Corporation, an AECOM company. The Village anticipates transferring the property to the developer in early March 2016 and construction starting roughly according to the scheduled provided in the reference materials. Scope of Services The Consultants scope of services with this proposal includes providing part-time construction observation and inspection services for the site/civil work within public right-of-way (ROW) per the approved plans and construction schedule including sewer and water improvements but exclusive of the buildings electric service work. Based on the anticipated start of services for this RFP of April 25, 2016 and the included construction schedule, the Consultant can assume approximately 100 working days for the site/civil work. Construction inspection is anticipated to be needed only when the contractor is performing site/civil work to verify the work is being installed per plan. Construction inspection will range between full-time for more critical items or buried utility connections to part-time for items that can be inspected post installation to verify they were installed per plan. The Consultant shall include hours to attend weekly construction meetings during the timeframes when site/civil work is occurring; a pre-construction meeting; developing a punch list; completing quantity summaries for work completed; and general administrative tasks and managerial supervision

Bid Related Documents

Download Document


Download Amendment

Product Code: 92532

Agency Information

Issuing Agency: Village of Oak Park

State: Illinois

Agency Type: State and Local

Contact: Bill McKenna Office of the Village Engineer, 201 South Boulevard, Oak Park, Illinois, 60302

Phone: 708-358-5728




FREE Market Analysis

Get a FREE 90-Day Market Analysis and see the bids you’ve been missing