Government Contract | Michigan
Pierce Electrical Upgrades

Bid Information

Bid Alert No: 00000537257

Bid Title: Pierce Electrical Upgrades

Agency Bid No. Title: 2003-01

Received Date: 04/08/2016

Close Date: 04/19/2016

Purchase Type: Not Stated

Delivery Point: Waterford, Michigan

Delivery Date: Not Stated

Special Notices: Pre-Bid Conference Optional 04/07/2016 11:00 AM


Specifications include, but are not limited to:. THE SCOPE OF WORK IS TO INCLUDE, but is not limited to the following items: 1. This category of work shall be all-inclusive. Contractor shall be considered a prime contractor, and will be responsible to furnish and coordinate all his subs and suppliers. 2. Perform all demolition and removal work, complete as shown on drawings and specifications, as indicated. This includes all mechanical, electrical, and structural demolition. 3. It is the responsibility of this Bid Category Contractor to review all drawing notes, including but not limited to architectural, structural, mechanical and electrical drawings for areas requiring work described in this bid category. Coordinate with other trades.Barton Malow Company Waterford School District 2003 Bond IssuePROJECT MANUAL March 28, 2016Section 00220 Bid Category 02 4000 4.Remove all masonry walls, CMU, brick, sills, anchors, brick support, angles, tie-ins, existing lintels, and associated items as indicated or shown. This includes removal of material at new door and/or window locations. 5.Remove concrete bollards, carbon monoxide floor plates, gate/framing, gypsum board assemblies, doors, frames, windows, plaster assemblies, glazing, overhead doors, wire mesh partitions, VCT, carpet, and wall base as indicated. 6.Remove all marker boards, tack boards, chalk boards, metal lockers, casework, counters, shelving, mirrors, soap dispensers, towel dispensers, and miscellaneous wall mounted items as indicated. 7.Remove the lay-in-ceiling system complete as indicated. Include all cost to tie all existing light fixtures up to allow the demolition of the ceiling grid to occur. The reinstallation of the lights into the new grid will be by the electrical contractor. 8.Remove all existing concrete slabs as indicated. This includes but is not limited to the removal of slabs required for installation of new mechanical, electrical, electrical, and foundations. 9.Remove the existing hoist system complete. 10.Remove steel monorail system complete. Coordinate with mechanical. 11.Salvage brick as may be indicated. 12.Coordinate all work with mechanical and electrical trades who shall assist with turn-offs and capping of mechanical/electrical items shown to be removed. 13.Remove and legally dispose of all debris generated from work of this Bid Category, and provide for own dumpster. Protect dumpster staging location from damaging any asphalt and/or concrete. This contractor will be responsible for any damages. 14. Provide daily cleanup according to Barton Malow standards, including daily removal of all materials and debris related to this category. 15. Provide for full protections of adjacent surfaces and safety precautions at all times. Contractor shall pay for any and all damages. 16. Provide and maintain dust control measures, including full height barriers to segregate construction activities from the adjacent areas of the building. 17. SAFETY: It is this contractors responsibility to provide full fall protection per Barton Malow requirements. Any workers found deficient will be permanently removed from the jobsite Provide each worker within this category with a hardhat (newer than 5 years old), safety glasses, reflective safety attire, work gloves, and other PPE required to perform job per the Barton Malow safety requirements. This is required at all times while working onsite. Failure to provide will result in removal of worker from site. Please review Barton Malow safety manual for specifics. All contractors are to take part in Barton Malows stretch and flex program daily and turn a sign in sheet with daily report with those who participated in the program. Please review the Barton Malow safety manual for specifics. All contractors must provide a person who is trained and certified in working around lead materials. This certified lead renovator must be on site when all demolition is occurring or when lead materials are effected by construction. Proof of training and a certificate must beBarton Malow Company Waterford School District 2003 Bond IssuePROJECT MANUAL March 28, 2016Section 00220 Bid Category 02 4000 provided to Barton Malow during submittal phase confirming the training of the individual. The contractor must also meet all new Federal, OSHA, MIOSHA, and DEQ requirements regarding lead. Each person working on site shall review the BMC safety orientation video before beginning work. Each contractor shall submit documentation that all of their employees have viewed the video

Product Codes: 91240, 91438, 91455

Agency Information

Issuing Agency: Waterford School District

State: Michigan

Agency Type: State and Local

Contact: Larry Bukowski 501 N. Cass Lake Rd., Waterford, Michigan, 48328