Government Contract | Maryland
Phase 3 Permanent Erosion Repairs at Esperanza Middle School

Bid Information

Bid Alert No: 00000552649

Bid Title: Phase 3 Permanent Erosion Repairs at Esperanza Middle School

Agency Bid No. Title: SMCPS-2016-09-DSS-DC

Received Date: 04/25/2016

Close Date: 05/18/2016

Purchase Type: Not Stated

Delivery Point: St. Mary's County, Maryland

Delivery Date: Not Stated

Special Notices: Pre-Bid Conference Optional 04/29/2016 11:00 AM, Bid Bond Required: 5%, Bidder Preregistration


Performing construction operations in the vicinity of the play field located to the north side of the school. The Contractor shall perform all work as required by the Contract Documents to include, but not limited to: 1.Clear and remove existing trees and vegetation to the limits shown on the Contract Drawings while protecting the trees remaining along the limit of disturbance. 2.Remove and salvage 4-foot high chain link fence per the Contract Drawings and reinstall at the end of project using replacement line posts. 3.Construct a new stormwater utility system consisting of 123 LF of 15" HDPE drain piping including 1 double "S" inlet, 2 manholes and outfall as shown on the Contract Drawings. 4.Work shall include performing all earthwork, seeding, sediment and erosion control, and related activities required to satisfactorily complete this project. 5.Remove from site the existing temporary stormwater utility system and associated material at the end of the project. 6.Contractor will engage a qualified geotechnical engineering testing agency to perform tests and inspections as necessary. No additional specifications were given.

Product Codes: 98814, 91223, 91339, 91340, 98852

Agency Information

Issuing Agency: St. Mary's County Public Schools

State: Maryland

Agency Type: State and Local

Contact: Bill Gross Department of Design and Construction, 27190 Point Lookout Road, Loveville, Maryland, 20656




FREE Market Analysis

Get a FREE 90-Day Market Analysis and see the bids you’ve been missing