Government Contract | Arizona
OSIRIS-REx Science Processing Operations Center (SPOC) Scheduling & Earned Value Management Support Services

Find Open Contracts in the Architecture and Engineering Industry

Find Contracts Now

Bid Information


Bid Alert No: 00000397849

Bid Title: OSIRIS-REx Science Processing Operations Center (SPOC) Scheduling & Earned Value Management Support Services

Agency Bid No. Title: L131610

Received Date: 10/20/2015

Close Date: 10/29/2015

Purchase Type: November 1, 2015 September 30, 2016

Delivery Point:

Delivery Date: Not Stated

Special Notices: Questions Due By 10/22/2015 12:00 PM

Specifications

Specifications include, but are not limited to:The OSIRIS-REx spacecraft will depart Earth in the Fall of 2016 and arrive at the carbonaceous asteroid Bennu in 2018. It will conduct nearly a year of reconnaissance, imaging the asteroid with a trio of visible-light cameras with overlapping capabilities in the search for a suitable site from which to obtain a minimum of 60 grams of sample from the asteroids surface. The spacecraft will begin its return to Earth in early 2021, landing at the Utah Test and Training range in 2023. This Statement of Work (SOW) covers work done by an outside contractor during Phase C/D (period of performance November 1, 2015 September 30, 2016). This SOW defines the required OSIRIS-REx Science Processing Operations Center (SPOC) Scheduling & Earned Value Management (EVM) Support Services including updating the existing schedule in Microsoft Project based on Control Account Manager (CAM) inputs, preparing/submitting the Integrated Master Schedule on a monthly basis, providing work breakdown structure status for EVM reporting, providing schedule variance analysis and supporting monthly reviews. Task 1: Update the existing schedule in Microsoft Project based on frequent CAM and Project Management inputs. Task 2: Develop a detailed resource loaded schedule for the remainder of SPOC development through Phase C/D (9/2016)

Bid Related Documents

Download Document

Amendments

Download Amendment

Product Codes: 92040, 92063, 92056, 92045

Agency Information


Issuing Agency: University of Arizona

State: Arizona

Agency Type: State and Local

Contact: Lila Sorensen Procurement and Contracting Services, 220 W. 6th Street, 5th FL, Tucson, Arizona, 85721

Phone: 520-626-3538

Fax: 520-621-5179

Email: lilas@email.arizona.edu

< PREVIOUS PAGE

GET A FREE
MARKET
ANALYSIS

FREE Market Analysis


Get a FREE 90-Day Market Analysis and see the bids you’ve been missing

GET BIDS NOW