Government Contract | Michigan
Osceola Refinery

Bid Information

Bid Alert No: 00000433929

Bid Title: Osceola Refinery

Agency Bid No. Title: 761/16034.AGY

Received Date: 12/08/2015

Close Date: 01/13/2016

Purchase Type: Not Stated

Delivery Point: 7150 Harris Drive, General Office Building, 3B, Dimondale, Michigan, 48821

Delivery Date: Not Stated

Special Notices: Questions Due By 01/05/2016 02:00 PM, Pre-Bid Conference Mandatory 12/16/2015 10:00 AM


Specifications include, but are not limited to:1) Mobilization and Demobilization: This task includes all costs for the mobilization and demobilization of all tools, personnel,equipment, and other materials necessary to complete the work.2) Job Administration: This task includes the preparation of the HASP and other incidentals needed to complete the project3) System Decommissioning: This task includes all equipment, labor, and materials for the decontamination, decommissioning,salvaging, and/or disposal of the soil and groundwater remediation system. Specific items to be conducted include, but are notnecessarily limited to, abandonment of the soil vapor extraction and air sparge wells, dismantling of a header, plumbing dismantlingand disposal, and electrical dismantlement.4) Treatment Building Removal: This task includes all costs, labor, equipment, and materials to dismantle and/or remove the 12foot by 18 foot treatment building and 12 foot by 10 foot treatment building from its current location.5) Remediation Equipment Credit: This task is the credit for the contractors possession of the Salvaged Remediation System.Refer to Appendix A for list of the equipment that was installed for the system. Note that the list is considered reasonably accurate;however, it is the contractors responsibility to verify the equipment during the pre-bid meeting.6) Building Credit: This task is the credit to the State of Michigan for the contractor taking ownership of the building(s). Informationregarding the buildings are contained in Appendix A. Note that the information is considered reasonably accurate; however, it isthe contractors responsibility to verify the building construction during the pre-bid meeting.7) System Appurtenance Disposal: This task includes all labor and costs for the disposal of the used remediation equipment andappurtenances that are deemed unusable (i.e. piping, conduits, tubing, headers, etc.). Assume one 10 cubic yard roll off will besufficient for disposal.8) Construction Report: This task includes all time, labor, and materials to provide a construction summary report disclosing thefate of all equipment and providing proof of disposal (manifests).9) Provisionary Allowance: This task is a $5,000 provisionary allowance for any unforeseen site conditions and/or miscellaneoussite tasks such as snow removal if necessary.

Bid Related Documents

Download Document

Bid Related Attachments

Download Attachment

Product Codes: 91240, 91438, 91468

Agency Information

Issuing Agency: State of Michigan - Department of Technology, Management and Budget (DTMB)

State: Michigan

Agency Type: State and Local

Contact: 530 West Allegan, PO Box 30026, Lansing, Michigan, 30026



FREE Market Analysis

Get a FREE 90-Day Market Analysis and see the bids you’ve been missing