Government Contract | California
Lassen Hall Elevator Addition & Modernization

Bid Information

Bid Alert No: 00000513712

Bid Title: Lassen Hall Elevator Addition & Modernization

Agency Bid No. Title: PW150011

Received Date: 03/15/2016

Close Date: 04/26/2016

Purchase Type: 1 year term

Delivery Point:

Delivery Date: Not Stated


Specifications include, but are not limited to:This work includes furnishing all labor, materials, tools, transportation services, equipmentand appliances required to perform all work to complete the project per plans, contractdocuments and Contract for the:CSU SACRAMENTOLassen Hall ElevatorSacramento, Californiain accordance with Drawings and Specifications prepared therefore by the office ofThe HR Group Work Included: Performance of all work shown on the Drawings, specified andrequired for the completion of providing the installation of one new elevator in anexisting shaft in Lassen Hall. This project also includes the modernization of theexisting elevator, as well as performing work necessary to condition the machineroom for both elevators; this includes electrical, structural, HVAC etc. Normaloperation of the building, and particularly the Testing Center, will impact thetimeline of this project. The best time for work that is noisy is between May 20,2016 and August 24, 2016 and between December 17, 2016 and January 18, 2017.The new car installation must come before the modernization of the existing car,as the building must always have an elevator in service. Generally speaking, thelead time for the needed elevator equipment may preclude the installation of thenew car during the summer break. If that is the case the University would like theContractor to perform work during the summer break (5/20/2016 8/24/2016) toprepare the building for the elevator installation over the winter break (12/17/2016 1/18/2017). This may include structural work, HVAC and electrical work, etc. withthe goal of being ready for the elevators contractor work to begin during winterbreak. Once the new elevator is installed and fully functional, the contractor canthen modernize the existing car. It is expected that the modernization will bequieter work, and should be able to be completed during normal campusinstruction periods, although the university would request any loud workaccompanying the modernization occur before 8:00 a.m. Normal campus businesstakes priority and active communication is required to successfully complete thisproject. Alternate work schedules may be required to complete this project.

Product Codes: 91013, 91438, 91450, 96218, 91597

Agency Information

Issuing Agency: California State University, Sacramento

State: California

Agency Type: State and Local

Contact: 6000 J Sreet, Sacramento, California, 95819