Government Contract | Louisiana
LA 1133: LA 27 - LA 108

Find Open Contracts in the Architecture and Engineering Industry

Find Contracts Now

Bid Information

Bid Alert No: 00000517653

Bid Title: LA 1133: LA 27 - LA 108

Agency Bid No. Title: H.012188.6

Received Date: 03/18/2016

Close Date: 04/13/2016

Purchase Type: Not Stated

Delivery Point:

Delivery Date: Not Stated


Specifications include, but are not limited to:The TCS shall be responsible for observing and evaluating both the day and night time performance of all traffic control devices installed on the project, in accordance with the Traffic Control Plan (TCP), to ensure that the devices are performing effectively as planned for both safety and traffic operations. This shall be done upon the initial installation of the devices and when any modifications and/or changes are made, in addition to the inspection of traffic control required in Heading (e). (3) The TCS shall be responsible for revisions requested by the contractor to the traffic control plan established in the contract and shall submit the new traffic control plan in accordance with Heading (c). (4) The TCS shall be responsible for the training of flagging personnel. This training will ensure that all flagging done on the project is in compliance with the MUTCD Part VI and Louisiana Work Zone Traffic Control Details. Flaggers shall be re-qualified every four (4) years. (5) The TCS shall coordinate all traffic control operations for the duration of the contract, including those of subcontractors, utility companies, and suppliers, to ensure that all traffic control is in place and fully operational prior to the commencement of any work. The Department recognizes that the contractor does not have direct control over the traffic control operations of the utility companies. The coordination provided by the TCS when dealing with utility companies is specifically for the purpose of coordinating concurrent utility traffic control with any other construction traffic control to avoid conflicts. (6) The TCS shall coordinate, in writing, all project activities with the appropriate law enforcement, fire control agencies, and other appropriate public agencies as determined at the pre-construction conference by the engineer. The TCS shall also invite the above agencies to the pre-construction conference. (7) The Department in collaboration with the TCS, shall prepare and submit statements concerning road closures, delays, and other project activities to the news media on a weekly basis or more often as needed. News releases shall be submitted to the engineer for review and approval prior to the Districts submittal to the news media. (8) The TCS shall be responsible for notifying the engineer, or designee, immediately of all vehicular accidents and/or incidents related to the project traffic control. The time and date of notification shall be documented in the traffic control diary. The TCS shall also monitor and document queues that occur as necessary. (9) The TCS assigned to the project shall attend the pre-construction conference and all project meetings

Bid Related Documents

Download Document

Product Codes: 91396, 91395

Agency Information

Issuing Agency: State of Louisiana - Department of Transportation and Development (DOTD)

State: Louisiana

Agency Type: State and Local

Contact: Alfonzo Simon 1212 East Highway Drive, PO Box 94245, Room N-204, Baton Rouge, Louisiana, 70804

Phone: 225-379-1111

Fax: 225-379-1857




FREE Market Analysis

Get a FREE 90-Day Market Analysis and see the bids you’ve been missing