Government Contract | Colorado
Kelsey Lake Bond Forfeiture Project

Bid Information

Bid Alert No: 00000590433

Bid Title: Kelsey Lake Bond Forfeiture Project

Agency Bid No. Title: 2016001579

Received Date: 06/03/2016

Close Date: 06/28/2016

Purchase Type: Not Stated

Delivery Point:

Delivery Date: Not Stated

Special Notices: Pre-Bid Conference Mandatory 06/14/2016 10:00 AM


Specifications include, but are not limited to:The project work will include repairing and installing a riprap channel, installing a low-water crossing, replacing topsoil, minor earthmoving and reseeding disturbed areas.ITEM 1.0: MOBILIZATION/DEMOBILIZATION This task includes those measures necessary and incidental to move equipment and supplies onto the Project Area, to move equipment within the Project Area, and to complete any other requirements necessary to accomplish the goals of this Project. This item also includes all labor, equipment, and costs associated with demobilization and clean-up of the work site following completion of the Project. Please see Specification 1.0, Mobilization / Demobilization of the General Bid Specifications, 2009. Measurement and Payment Payment for ITEM 1.0 shall be reflected in a lump sum quote price under ITEM 1.0 on the Bid Schedule. Payment shall include all the CONTRACTORS expenses for mobilization of equipment to the site, transportation of the equipment within the project area, employee time, labor and materials necessary to accomplish the requirements of this item, compliance with the conditions and requirements described in this item description, and final clean-up of the work place. ITEM 2.0 PROJECT SAFETY, HEALTH, AND ENVIRONMENTAL ACTION PLAN (SHEAP) The job will involve working around an inactive mine, and it is the responsibility of the CONTRACTOR to be aware of all OSHA regulations which apply to this contract. This task includes all the Contractors expenses for employee time, labor, materials, and safety equipment and safety training necessary for preparing and executing a job safety plan. The Successful Bidder will be required to prepare the Project Safety Plan (SHEAP) and submit it for review and approval to the DRMS. The CONTRACTOR is required to develop and implement a Project Safety Plan in conjunction with project implementation. PROJECT MANAGER must receive the Project Safety Plan within five (5) working days of Notice to Proceed date. It is expected that the Project Safety Plan will be comprehensive and sufficiently detailed so that every member of the work crew (including sub-contractors) on site understands their responsibilities and the responsibilities of CONTRACTOR to ensure a safe and injury free work place

Bid Related Documents

Download Document

Bid Related Attachments

Download Attachment


Download Amendment Download Amendment

Product Codes: 96273, 98800

Agency Information

Issuing Agency: State of Colorado - Department of Natural Resources

State: Colorado

Agency Type: State and Local

Contact: Teresa Ryan Division of Reclamation, Mining and Safety, 1313 Sherman Street, Room 215, Denver, Colorado, 80203

Phone: 303-866-3567




FREE Market Analysis

Get a FREE 90-Day Market Analysis and see the bids you’ve been missing