Government Contract | Missouri
Joplin Engineering Services and Project Management

Bid Information

Bid Alert No: 00000434002

Bid Title: Joplin Engineering Services and Project Management

Agency Bid No. Title: RFQ-2016-01

Received Date: 12/09/2015

Close Date: 01/04/2016

Purchase Type: Not Stated

Delivery Point: Joplin, Missouri

Delivery Date: Not Stated

Special Notices: Site-Walk Mandatory, Bidder Preregistration


Specifications include, but are not limited to:he selected firm will be required to perform engineering and project management services to be specified more fully in a contract agreement. The contract agreement will provide for payment for phases of work completed with options to proceed through all phases or to discontinue work as the circumstances may dictate. The City anticipates a contract which will include drawings, production of computer generated renderings, and cost estimations; however, the City reserves the right to include additional project elements in the initial or subsequent professional services agreements as the City may (in its sole discretion) deem appropriate. The selected engineering firm will be required to retain and be responsible for all basic engineering disciplines such as mechanical, electrical, plumbing, fire protection, environmental mitigation and structural engineering as appropriate for the Scope of Work negotiated. The selected firm is also required to identify and select the appropriate sub-consultants; however, the City reserves the right to approve proposed sub-consultants that will be associated with the Project. The plans/documents developed by the selected firm will be sufficient to allow for complete and accurate pricing and construction/environmental mitigation of the intended space. Documents for this submittal shall consist of as a minimum:Construction Documents and AdministrationThe selected firm shall further prepare, document and develop final Construction Documents and Mitigation Plans to cover all proposed work to include but not limited to:1. Preparation of complete set of construction documents and environmental mitigation plans developed from a client-approved set of scope documents. One (1) reproducible of each sheet shall be provided to the client for review at 50% and 90% completion stages. One (1) reproducible of each sheet shall be provided to General Contractors, as directed by client, and to client after all required corrections are made on the original reproducible documents. At 100% completion, two complete sets of as-built drawings and specifications will be delivered to City of Joplin.2. The construction documents will be sufficient to allow for complete and accurate pricing and construction/environmental mitigation. Documents shall be complete.3. The firm shall be responsible for coordinating its construction documents with plans prepared by others. The firm will provide timely interpretations of the construction documents to the selected mechanical, electrical, plumbing and structural engineers and such other consultants which the client may choose to become involved in the preparation of plans.4. Prior to the completion of the Construction Documents/Environmental Mitigation Plans, at approximately 75% completion, the firm shall prepare a permit set of documents showing all required information necessary to obtain a building permit from the City of Joplin.

Bid Related Documents

Download Document

Product Codes: 92578, 92516, 92508, 92570

Agency Information

Issuing Agency: City of Joplin

State: Missouri

Agency Type: State and Local

Contact: Tony Robyn City Hall, 602 S. Main Street, 4th Floor, Joplin, Missouri, 64801

Phone: 417-626-0966




FREE Market Analysis

Get a FREE 90-Day Market Analysis and see the bids you’ve been missing