Government Contract | Washington
ITS Implementation Phase 2

Find Open Contracts in the Architecture and Engineering Industry

Find Contracts Now

Bid Information

Bid Alert No: 00000450212

Bid Title: ITS Implementation Phase 2

Agency Bid No. Title: Not Stated

Received Date: 12/29/2015

Close Date: 01/25/2016

Purchase Type: Not Stated

Delivery Point: Kirkland, Washington

Delivery Date: Not Stated


Specifications include, but are not limited to: The work to be performed under the Kirkland ITS Implementation Phase 2 project consists of traffic signal cabinet improvements and deployment of intelligent transportation systems (ITS) technology such as closed circuit television (CCTV) cameras, vehicle detection equipment and Accessible Pedestrian Signal (APS) system for improved operations of signalized corridors. The project will also include the installation of fiber optic communications and networking equipment to connect field equipment with the City's Traffic Management Center. The scope will also include the implementation of project temporary traffic control plans to construct the proposed project improvements. The geographic region for the project includes intersections on major arterial roadways within the Totem Lake Urban Center.

Bid Related Documents

Download Solicitation Notice

Product Codes: 55090, 92032, 96882

Agency Information

Issuing Agency: City of Kirkland

State: Washington

Agency Type: State and Local

Contact: 123 5th Ave., Kirkland, Washington, 98033



FREE Market Analysis

Get a FREE 90-Day Market Analysis and see the bids you’ve been missing