Government Contract | Utah
Installation of electric vehicle charging station by directional drilling and electrical conduit.

Bid Information


Bid Alert No: 00001077996

Bid Title: Installation of electric vehicle charging station by directional drilling and electrical conduit.

Agency Bid No. Title: OREM20182356

Received Date: 09/01/2017

Close Date: 09/14/2017

Purchase Type: Not Stated

Delivery Point: Orem, Utah

Delivery Date: Not Stated

Special Notices: Pre-Bid Conference Mandatory 09/07/2017 09:00 AM

Specifications

Specifications include, but are not limited to:1.1 SAE J1772 standard for specialized connector1.2 UL listed1.3 UL2231 (Parts 1 and 2) UL standard forPersonnel Protection Systems for EV supply circuits1.4 Enclosure Rating - NEMA 3R or better, per UL50E1.5 NEC Article 625 and related articles and tables1.6 Open Safety Ground Detection continuouslymonitors presence of safety (green wire) groundconnection1.7 Surge Protection 6kV @ 3000A1.8 Ground Fault Detection 20mA CCID with autoretry1.9 Operating Temperature -22F to 122F (-30C to+50C)1.10 Operating Humidity up to 85% @ +50C(122F) non-condensing2.1 Single and Dual Port Models2.2 Input Power 208V/240V 60Hz single phase @30A2.3 Power Share ability to power two J1772 portswith a single 30A circuit. When a single vehicle is connected it receives the full 30A power (6.24kW at208V), and when two vehicles are connected eachvehicle receives 16A power (3.3kW at 208V).

Product Codes: 07506, 91438, 91216

Agency Information


Issuing Agency: City of Orem

State: Utah

Agency Type: State and Local

Contact: Sierra Hinckley

Phone: 801-229-7337

Email: sehinckley@orem.org

< PREVIOUS PAGE

GET A FREE
MARKET
ANALYSIS

FREE Market Analysis


Get a FREE 90-Day Market Analysis and see the bids you’ve been missing

GET BIDS NOW