Government Contract | Nevada
Independent Cost Estimator Services for the SR 28 Federal Lands Access Program (FLAP) Project

Bid Information


Bid Alert No: 00000493911

Bid Title: Independent Cost Estimator Services for the SR 28 Federal Lands Access Program (FLAP) Project

Agency Bid No. Title: 070-16-015

Received Date: 02/23/2016

Close Date: 03/10/2016

Purchase Type: Not Stated

Delivery Point: Nevada

Delivery Date: Not Stated

Special Notices: Questions Due By 02/29/2016 11:00 AM

Specifications

Specifications include, but are not limited to:The proposed SR 28 FLAP Project is broken down into four (4) phases. A brief description of the majoritems of scope for each phase is provided below.Phase 1 - NV FLAP SR 28, North Demonstration Project Phase 1:Phase 1 consists of constructing the first mile of the three (3) mile North Demonstration Project shareduse path, from Incline Village to Hidden Beach. The path includes a 10-foot wide paved path with a 2-foot shoulder on each side with pedestrian rail, and will require multiple retaining walls and structuresalong the path. This Phase will also include construction of the Flume Trail Trailhead Parking Lot, TunnelCreek Parking Lot, and tunnel crossing under SR 28 at Hidden Beach.Phase 2 - NV FLAP SR 28, North Demonstration Project Phase 2: Phase 2 consists of constructing the remaining two (2) miles of the North Demonstration Project shareduse path from Hidden Beach to Sand Harbor. Like the first phase, the path will include a 10-foot widepaved path with a 2-foot shoulder on each side with pedestrian rail, and will require multiple retainingwalls and structures along the path. Construction of the path in Phases 1 and 2 may include items ofwork such as, associated grading, rock fracturing and/or rock removal, tree removal, construction ofdrainage improvements, traffic control, storm water pollution prevention, erosion control, and theavoidance, minimization, and/or restoration of impacts associated with the construction of the in-situ pathimprovements.Phase 3 - SR 28 Safety and Corridor Improvements:Phase 3 consists of a number of proposed safety and operational improvements, including installation ofcenterline rumble strips, guardrail and/or barrier on the Lake side of SR 28 in select locations, andmodifications to emergency/maintenance turnouts and scenic viewpoint turnouts. Additionally, newparking areas may be constructed on the SR 28 corridor, which will be identified in the US Forest Serviceenvironmental document.Phase 4 - NV FLAP SR 28, NDOT EIP and Water Quality ImprovementsPhase 4 consists of water quality and erosion control improvements along SR 28 approximately fromSand Harbor to the Washoe County Line, that includes source control and treatment facilities.Improvements may include riprap slopes, re-vegetated slopes, retention/detention basins, water qualitybasins, water quality treatment devices, paved/stabilized shoulders, culvert rehabilitation, etc.

Product Codes: 95826, 96121

Agency Information


Issuing Agency: State of Nevada - Department of Transportation

State: Nevada

Agency Type: State and Local

Contact: Agreement Services 1263 South Stewart Street, Room 101A, Carson City, Nevada, 89712

Phone: 775-888-7070

Fax: 775-888-7101

Email: agreeservices@dot.state.nv.us

< PREVIOUS PAGE

GET A FREE
MARKET
ANALYSIS

FREE Market Analysis


Get a FREE 90-Day Market Analysis and see the bids you’ve been missing

GET BIDS NOW