Government Contract | Georgia
Honey Creek Pump Station, Force Main and Gravity Sewer Improvements Project

Bid Information

Bid Alert No: 00000527010

Bid Title: Honey Creek Pump Station, Force Main and Gravity Sewer Improvements Project

Agency Bid No. Title: 16-500393

Received Date: 03/29/2016

Close Date: 04/21/2016

Purchase Type: Not Stated

Delivery Point: 7501 Rockland Road, Lithonia GA 30038

Delivery Date: Not Stated

Special Notices: Pre-Bid Conference Mandatory 04/07/2016 01:00 PM, Questions Due By 04/13/2016 04:00 PM


Specifications include, but are not limited to: It is anticipated that the Design-Builder shall provide the County with the following integrated Design-Build services: Project Management oProvide Project planning and control. oObtain Project-related permits. oProvide internal Project communications and assist the County with external communications, such as press releases. oDevelop a design and construction quality control program. oDevelop a construction safety program. Design oHoney Creek PS Improvements Design and develop construction documents to improve the existing Honey Creek Pump Station as it relates to handling current flows: oDesign and construction of Interim Peak Storage Solution facility (ies) to temporarily store peak wet weather wastewater flows. The Design-Builder shall consider utilizing existing storage facility capacity (existing structures once a part of the modified WWTP) as part of their storage capacity design; reference Attachment M: Project Background Documents. This work shall be completed in accordance with Section III: Table 3 Progressive Design-Build Completion Schedule, and will be considered as temporary until the new pump station and force main are placed into service. Design and develop construction documents for the Honey Creek Pump Station Improvements and ancillary facilities and appurtenances utilizing the anticipated flows outlined in Section I: Table l Total Projected Annual Average Daily Wastewater Flow Estimates for Honey Creek PS. The Honey Creek PS Improvements shall include but not be limited to: o Pump station housing. o Electrical building. o Odor control system and facilities. o Screenings grit collection and disposal facilities. o Standby power facilities. o Material and equipment handling facilities. o Instrumentation equipment normally included as part of a modern facility of this type. o Communication systems that can link the existing DWM SCADA facilities. o Reference Section III: Table 3 Progressive Design-Build Completion

Product Codes: 91079, 92525, 91080, 91427, 91339, 91340

Agency Information

Issuing Agency: County of DeKalb

State: Georgia

Agency Type: State and Local

Contact: Adrein Walker Purchasing and Contracting, 1300 Commerce Drive, 2nd Floor, Decatur, Georgia, 30030

Phone: 404-687-3949




FREE Market Analysis

Get a FREE 90-Day Market Analysis and see the bids you’ve been missing