Bid Alert No: 00000523754

Bid Title: HAYMON MORRIS ROAD SIDEWALK (PROJECT #SR043)

Agency Bid No. Title: RFB2016-13

Received Date: 03/24/2016

Close Date: 04/14/2016

Purchase Type: Not Stated

Delivery Point: Barrow County, Georgia

Delivery Date: Not Stated

Special Notices: Pre-Bid Conference Mandatory 04/01/2016 10:00 AM, Questions Due By 04/06/2016 05:00 PM, Performance Bond Required: 100%, Payment Bond Required: 100%, Bid Bond Required: 5%

Specifications

Specifications include, but are not limited to:All work to include design, permitting, layout and installation of concrete sidewalk, concrete curb& gutter, pavement markings, incidental walls, grading, import of fill (approximately 1500 cubicyards) clearing, stormwater pipe and all incidental work for the project. The Contractors engineershall also provide the design, inspections and material testing for the concrete retaining walls withsupporting documentation to be provided to Barrow County. The Contractor shall provide thedesign for the three (3) retaining wall locations. The contractor shall provide the design and theerosion & sediment control plans for the sidewalks. The 4 concrete header curb at the outsideedge of the sidewalk (certain locations) shall include gaps where required for drainage. TheContractor shall place the sidewalks and concrete walls according to the attached: one (1) sitemap, one (1) sidewalk map, eight (8) location maps, two (2) pages of Station Log, fifteen (15)pages of GDOT standard details & specifications, forty two (42) pages of Technical Specifications.The attached pictures of the handrails are examples only. Barrow County shall be responsible forany needed temporary construction easements if required. The sidewalks will be located withinthe existing rights of ways. Six (6) surveys showing the road rights of ways are attached forreferenced. Barrow County shall be responsible for relocating any utilities. The Contractor shall beresponsible for notifying the Utilities Protection Center before any grading. The Contractor shall berequired to perform a compaction roll test on the subgrade before pouring the concrete sidewalks,in the presence of a County inspector. The concrete curb & gutter shall be tapered at the endingpoints per GDOT standards.

Product Codes: 96861, 91276, 91347, 91319, 91360, 91345

Agency Information


Issuing Agency: County of Barrow

State: Georgia

Agency Type: State and Local

Contact: Cindy Clack Clerks Office, 30 North Broad Street, Winder, Georgia, 30680

Phone: 770-867-1977

Email: cclack@barrrowga.org