Greenwood Wastewater Treatment Plant Emissions and Odor Control Improvements

Bid Information

Bid Alert No: 00000534967

Bid Title: Greenwood Wastewater Treatment Plant Emissions and Odor Control Improvements

Agency Bid No. Title: E10047

Received Date: 04/06/2016

Close Date: 04/20/2016

Purchase Type: Not Stated

Delivery Point: Corpus Christi, Texas

Delivery Date: Not Stated

Special Notices: Pre-Bid Conference Optional 04/13/2016 02:00 PM, Bid Bond Required: 5%, Payment Bond Required: , Performance Bond Required:


The scope of this project involves removing elements of an existing odor control system and installing components of a new BioAir Biotrickling Filter at the Greenwood Wastewater Treatment Plant. The following are major work items associated with this project: B.Demolition of Existing PVC drain pipes, duct work, air blowers and various items associated with an existing odor control system. C.Construction of a 50 square yard steel reinforced structural concrete slab. D.Installation of various yard piping including 2, 4 and 6 PVC pipes with fittings. E.Unloading and Installation of a new BioAir Biotrickling filter (Biotrickling filter unit provided by City). Contractor to unload the unit and install according to manufacturers recommendations. Installation to include, concrete slab, PVC piping work, PVC duct work and electrical work. No additional specifications were given.

Bid Related Documents

Download Solicitation Notice

Product Codes: 91240, 91430, 91468, 93691, 91391

Agency Information

Issuing Agency: City of Corpus Christi

State: Texas

Agency Type: State and Local

Contact: City Hall Building, 1st Floor, 1201 Leopard Street, Corpus Christi, Texas, 78401