Government Contract | Texas
Forest North Drainage Improvements - Bayswater Zone

Find Open Contracts in the Architecture and Engineering Industry

Find Contracts Now

Bid Information

Bid Alert No: 00000453966

Bid Title: Forest North Drainage Improvements - Bayswater Zone

Agency Bid No. Title: Not Stated

Received Date: 01/07/2016

Close Date: 02/02/2016

Purchase Type: 40 days for completion

Delivery Point:

Delivery Date: Not Stated

Special Notices: Pre-Bid Conference Mandatory 01/20/2016 03:00 PM


Specifications include, but are not limited to:Item 132All materials brought to project site shall have a maximum P.I. of 25 and minimum P.I. of 6.Borrow sources shall be submitted and approved by observer prior to delivery to project. TheEngineer must approve the embankment material before use on the project.Embankment quantities are measured to the bottom of the topsoil (4 below the proposed grade).To the extent possible, all existing topsoil shall be salvaged, stockpiled and redistributed to thegraded areas.Item 160The Construction Observer shall be notified to inspect all topsoil sources before digging begins.All off-site topsoil shall have a minimum PI of 20. The actual depth of the topsoil source shallbe as approved by the construction observer. Topsoil shall comply with the requirements of item20-1 of the Williamson County Protocol for sustainable roadsides.Item 161 and Item 164Compost, mulch and seed mixtures shall comply with the requirements of the WilliamsonCounty protocol for sustainable roadsides. Apply 3 of erosion control compost (ECC) on top of4 of topsoil in all areas to be revegetated, unless otherwise directed. Install topsoil at proposedgrade and place ECC above proposed grade.Item 168The Contractor shall obtain water at a source that is metered or shall furnish the manufacturersspecifications showing tank capacity for each truck used. The Contractor shall notify theConstruction Observer prior to watering so that the Construction Observer may verify meterreadings or truck counts. Water all areas of the project to be seeded or sodded. Maintain theseed bed in a condition favorable for the growth of grass. Watering can be postponedimmediately after a rainfall on the site of 1/2 inch or greater, but shall be resumed before thesoil dries out, continue watering until final acceptance. County is not responsible for the sourceof water to be used on the project even during a drought condition. Watering rates shall complywith the requirements of the Williamson County protocol for sustainable roadsides.Item 400Any adjustments or changes made to a job mix formula must be submitted and approved prior toproduction of the new job mix formula. No RAP or RAS will be allowed in asphalt mix.Maximum lifts for level-up at culverts is 2-inches. Temporary pavement will be subsidiary tothe Cut & Restore Pavement pay item

Bid Related Documents

Download Document

Product Codes: 91339, 91360, 91345

Agency Information

Issuing Agency: County of Williamson

State: Texas

Agency Type: State and Local

Contact: 901 S. Austin Ave., Georgetown, Texas, 78626



FREE Market Analysis

Get a FREE 90-Day Market Analysis and see the bids you’ve been missing