Government Contract | California
FINISHED WATER PUMP STATION ELECTRIFICATION PROJECT FINAL DESIGN AND CONSTRUCTION MANAGEMENT

Bid Information


Bid Alert No: 00000464154

Bid Title: FINISHED WATER PUMP STATION ELECTRIFICATION PROJECT FINAL DESIGN AND CONSTRUCTION MANAGEMENT

Agency Bid No. Title: 201601

Received Date: 01/20/2016

Close Date: 02/08/2016

Purchase Type: Not Stated

Delivery Point: Vallejo, California

Delivery Date: Not Stated

Specifications

Specifications include, but are not limited to: The City of Vallejo invites qualified consultants to submit proposals for professional engineering services for Final Design of the Finished Water Pump Station (FWPS) Electrification Project and Construction Management services. The selected consultant shall be tasked to provide the full range of services to prepare plans and specifications, construction cost estimates and schedules at both the 50-percent and 90-percent design stages, a final 100-percent design bid package, bid review assistance and construction management services, which shall include construction inspection and start-up testing. Specifications are to be numbered, written and formatted to Construction Specification Institute (CSI) standards.

Bid Related Documents

Download Document

Bid Related Attachments

Download Attachment

Amendments

Download Amendment

Product Code: 92518

Agency Information


Issuing Agency: City of Vallejo

State: California

Agency Type: State and Local

Contact: Victor Gonzalez, Water Division 202 Fleming Hill Rd., Vallejo, California, 94589

Phone: 707-648-4307

Fax: 707-648-4060

Email: victor.gonzalez@cityofvallejo.net

< PREVIOUS PAGE

GET A FREE
MARKET
ANALYSIS

FREE Market Analysis


Get a FREE 90-Day Market Analysis and see the bids you’ve been missing

GET BIDS NOW