Government Contract | Florida
Financing of Energy Performance Contract

Bid Information

Bid Alert No: 00000557853

Bid Title: Financing of Energy Performance Contract

Agency Bid No. Title: RFP 2016-02

Received Date: 04/29/2016

Close Date: 05/17/2016

Purchase Type: Not Stated

Delivery Point:

Delivery Date: Not Stated


Specifications include, but are not limited to:Facility Improvement Measures (FIMs) include the following: FIM 1 Water conservation retrofit measure incorporates the installation of lower consumption flush valves and aerators, pedal valve faucet control, and new fixtures where appropriate. This measure will reduce overall water consumption and water heating requirements, which will generate cost savings. FIM 2 Interior lighting retrofit with occupancy sensors measure incorporates the retrofit of existing interior and exterior lighting fixtures at the Main, Ghazvini and FPSI Campuses. The retrofitted interior lighting system will incorporate LED or 25W T8 linear fluorescent lighting with normal power electronic ballasts. Existing high bay interior lighting and exterior lighting will be retrofitted with more energy efficient LED or metal halide fixtures. Occupancy sensors will be installed throughout the facilities to operate the lighting based on occupancy. FIM 3 Main Campus - Install new condensing hot water boilers and eliminate the steam system in the plant. The new boilers will be better sized and will have thermal efficiencies greater than 90% as compared to the existing boilers which have thermal efficiencies around 70%. FIM 4 Building Automation - The existing building automation system used throughout the campuses has areas that are not functioning with the latest technologies. This includes some old pneumatic controls that would be replaced. The existing system will be upgraded or integrated to the SIEMENS APOGEE BAS and the latest controls strategies would be utilized to provide the best learning and living environments for the occupants. A.3 Summary Description of Phase II Facility Improvement Measures Facility Improvement Measures (FIMs) include the following: FIM 5 Upgrade of existing chilled water plant to include replacement of chillers, cooling towers, pipe, and automation system to maximize overall efficiency of plant, provide for renewal of infrastructure, and overall efficiency of chilled water system. This FIM will be further defined after completing additional Phase II development work. FIM 6 Replacement or upgrade of air handling units at various locations on campus. This FIM will be further defined after completing additional Phase II development work

Bid Related Documents

Download Document

Product Code: 94654

Agency Information

Issuing Agency: Tallahassee Community College

State: Florida

Agency Type: State and Local

Contact: Cheri Davis 444 Appleyard Drive, Tallahassee, Florida, 32304

Phone: 850-201-6069




FREE Market Analysis

Get a FREE 90-Day Market Analysis and see the bids you’ve been missing