Government Contract | Washington
Fairwood Sewer Phase II East

Find Open Contracts in the Architecture and Engineering Industry

Find Contracts Now

Bid Information

Bid Alert No: 00000458590

Bid Title: Fairwood Sewer Phase II East

Agency Bid No. Title: Not Stated

Received Date: 01/12/2016

Close Date: 02/02/2016

Purchase Type: Not Stated

Delivery Point:

Delivery Date: Not Stated

Special Notices: Pre-Bid Conference Optional 01/21/2016 09:00 AM, Bidder Preregistration, Performance Bond Required: 100%, Payment Bond Required: 100%, Bid Bond Required: 5%


Specifications include, but are not limited to:The scope of work for this project consists of the replacement or rehabilitation of approximately 370 ft. of 18-in. diameter concrete sewer pipe, including four new sewer manholes. Portions of the existing sewer pipe are located under the Seattle Public Utility (SPU) water mains. Methods of installation include roughly 285 ft. of open-cut and 85 ft. of jack-&-bore. The project also includes the abandonment of a sewer manhole and approximately 400-ft. of sewer pipe. Restoration for the open-cut portion of the project includes sidewalk and curb & gutter replacement, trench patching, asphalt grind and overlay and mitigation and restoration planting for two small wetland areas and their buffers.

Bid Related Documents

Download Solicitation Notice

Product Codes: 96875, 91339, 91340, 91360, 91345

Agency Information

Issuing Agency: Cedar River Water And Sewer District

State: Washington

Agency Type: State and Local

Contact: 18421 S.E. Petrovitsky Road, Renton, Washington, 98058



FREE Market Analysis

Get a FREE 90-Day Market Analysis and see the bids you’ve been missing